Page 137
Issue 08/2013
Maintenance and care
Safety instructions
Warning
Risk of injury and risk of damage!
y
During maintenance, make sure that the PE/PA connection
(potential connection, usually green / yellow) between the
lifting magnet and generator controller is connected to the
electricity supply. Without this, the detection of external ISO
faults in the lifting magnet will not be possible.
y
If this connection is not present, an installed insulation
monitor may no longer be able to detect an insulation fault.
Caution
Burn hazard
y
Parts of the
i
MAPLA system can get very hot during and after
operation.
►
Allow the
i
MAPLA-System and parts to cool down before
touching.
Important
As a unit generating electrical power, the
i
MAPLA system and
the machinery materials are to be considered a part of an overall
system. The relevant national regulations on accident prevention
are applicable (in Germany for instance DIN / VDE 0113-EN60204,
DIN / VDE 0701 and DIN / VDE 0702 BGV-A3).
Heed the appropriate test deadlines.
Important
Check that all the connector plugs have been plugged in/
engaged correctly and locked against accidental removal.