20
ON
/OF
F
–
o
Battery Harness Wires
Transformer Wires
Receiver Wires
Accessory Wires
Neatly arrange all
wires to lay flat as
they come out of
the opener.
MIghty Mule 350
Wire Routing
Routing Pin
ON/OF
F
ON/OFF
Receiver Wire
Battery Harness Wire
Battery Harness
In-Line 20 Amp Fuse
(included)
Battery Harness
Connectors
20
The battery harness wire has
an in-line 20 Amp fuse that
must be placed inside the
opener when connecting the
battery to the opener. The il-
lustration to the right shows
the best placement for the bat-
tery harness wire, connector
and in-line fuse.
The wires from the battery harness, receiver, transformer or solar panel, and any
accessories that have been installed must be routed down the sides of the opener
and flatly out the strain relief slot in the back of the opener.
It is IMPORTANT that the wires lay flat and run inside the
routing pins at the back of the opener and out the strain relief
slot without being pinched when the control board access
cover is replaced. See the illustrations to the right and below.
Strain Relief Slot
To avoid stripping screw
holes - tightening screws
by hand with a hand held
screwdriver is recommended.
If you have any questions
please call GTO Technical
Service at
1-800-543-1236
.
IMPORTANT: Deailed Wire Routing Diagrams