Geophysical Survey Systems, Inc.
SIR® 30
Manual
MN 93-101 Rev E
52
display. Other ratio’s of Scans per Unit, Ticks per Unit and Tick per Major Tick may be more (or less)
useful. In the example below we have set the Scans per Meter to 100, the Ticks per Unit to five (5) and the
Ticks per Major tick to five (5) which results in the distance scale in Figure 77 below.
Figure 77: Tick per Unit = Five, Ticks per Major Tick = Five.
If we now change the Ticks per Unit to five (5) and the Ticks per Major Tick to one (1), the distance scale
becomes too crowded to display the numeric distance values.
Figure 78: Tick per Unit = Five, Ticks per Major Tick = One
This scale setting results in the correct ‘Tick’ scale, however there is not adequate space between the
distance scale ticks and the distance scale values begin to crowd together. Changing the Ticks per Unit to
one (1) and the Ticks per Major Tick to two (2) results in a distance scale that is more suitable.
Содержание SIR 30
Страница 1: ......
Страница 4: ...Geophysical Survey Systems Inc SIR 30 Manual ...
Страница 6: ......
Страница 90: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 84 ...
Страница 102: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 96 ...
Страница 120: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 114 ...
Страница 122: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 116 ...
Страница 144: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 138 Figure 168 SIR 30 Cable Pin out ...
Страница 145: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 139 Figure 169 Cable Selection Guide ...
Страница 146: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 140 Figure 170 Survey Wheel and Model 10 Marker Pin Out ...
Страница 147: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 141 Figure 171 Serial Port GPS Pin out ...
Страница 148: ...Geophysical Survey Systems Inc SIR 30 Manual MN 93 101 Rev E 142 ...