5. Sidewall Construction
PNEG-1510
Top Dry 24', 30' and 36' Manual Batch
25
Sidewall Construction Instructions
Figure 5C
Using correct size bin bolts throughout, begin assembling sidewall sheets end to end (overlapping the
same way throughout) until the ring is complete. All body sheet bolts are to be installed with the bolt head
and its neoprene washer to the outside and the nut on the inside. Do not tighten bolts until all sheets are
assembled and form a complete ring. Tighten the bolts in sequence, starting from the center and work to
the edge in both directions. This permits the sidewall sheets to draw-up evenly.
After assembling the
second ring
, lift the top ring sheets in place, add top stiffeners, build the Top Dry
floor, then the roof.
NOTE:
The sidewall sheets used for the top ring are punched to accommodate the eave flashing bolts.
NOTE:
The fan entrance sheet and access door are located in the second ring. Attach the top stiffeners,
leaving out the seven (7) bolts indicated in
at each stiffener location. Install the flashing
bolts from the outside.
Figure 5D Top 2 Rings
Содержание Top Dry 24
Страница 1: ...PNEG 1510 Top Dry 24 30 and 36 Manual Batch Construction and Owner s Manual PNEG 1510 Date 02 18 13 ...
Страница 2: ...2 PNEG 1510 Top Dry 24 30 and 36 Manual Batch ...
Страница 30: ...6 Stiffener Details 30 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Outside Stiffeners Continued Figure 6A ...
Страница 34: ...6 Stiffener Details 34 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Stiffener and Seam Locations Figure 6E ...
Страница 78: ...10 Accessories 78 PNEG 1510 Top Dry 24 30 and 36 Manual Batch 2 Ring Door Assembly Figure 10B ...
Страница 80: ...10 Accessories 80 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Optional Bin Step Assembly WD 042 Figure 10C ...
Страница 82: ...82 PNEG 1510 Top Dry 24 30 and 36 Manual Batch NOTES ...