PNEG-1510
Top Dry 24', 30' and 36' Manual Batch
35
7. “C” Channels
Stiffener to “C” Channel Bracket Installation
Install the stiffeners on the outside of the bin and the wall brackets on the inside of the bin. The wall
brackets are to be positioned with the brackets top hole matching the first hole up from the horizontal seam
(not counting the horizontal seam). Bracket to sidewall connection using a 3/8" x 1-1/2" bolt (S-2086),
head outside, with a neoprene washer (S-3558) against the wall on the inside.
Figure 7A
Содержание Top Dry 24
Страница 1: ...PNEG 1510 Top Dry 24 30 and 36 Manual Batch Construction and Owner s Manual PNEG 1510 Date 02 18 13 ...
Страница 2: ...2 PNEG 1510 Top Dry 24 30 and 36 Manual Batch ...
Страница 30: ...6 Stiffener Details 30 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Outside Stiffeners Continued Figure 6A ...
Страница 34: ...6 Stiffener Details 34 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Stiffener and Seam Locations Figure 6E ...
Страница 78: ...10 Accessories 78 PNEG 1510 Top Dry 24 30 and 36 Manual Batch 2 Ring Door Assembly Figure 10B ...
Страница 80: ...10 Accessories 80 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Optional Bin Step Assembly WD 042 Figure 10C ...
Страница 82: ...82 PNEG 1510 Top Dry 24 30 and 36 Manual Batch NOTES ...