5. Sidewall Construction
PNEG-1510
Top Dry 24', 30' and 36' Manual Batch
23
Sidewall Erection Instructions
Before bolting the sidewall sheets together, check that you have the proper gauge steel for the first ring.
The higher gauge numbers denote the thinner materials. (For example, 22 gauge material is thinner than
14 gauge.) In erecting most grain bins the thinnest material usually goes on top, therefore the first sidewall
ring you assemble will be the top ring of the bin. Check the various gauges of the bin with the color code
chart and begin building accordingly. REMEMBER...... Assemble the top ring first.
Color Code Chart
Once you have selected the proper gauge material, begin assembling all sidewall sheets in the following
manner: Standing on the inside the bin, place the left panel to the inside with the right panel to the outside.
Check to see that the sidewall sheet is “Right side up”.
Figure 5A
Gauge
Color Code
Gauge
Color Code
22
White
14
Green
20
Red
13
Yellow/Blue
19
Black/Yellow
12
Black
18
Orange
11
Pink
17
Pink/Light Blue
10
Light Blue
16
Blue
9
Blue/Orange
15
Brown/Red
8
Yellow
Содержание Top Dry 24
Страница 1: ...PNEG 1510 Top Dry 24 30 and 36 Manual Batch Construction and Owner s Manual PNEG 1510 Date 02 18 13 ...
Страница 2: ...2 PNEG 1510 Top Dry 24 30 and 36 Manual Batch ...
Страница 30: ...6 Stiffener Details 30 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Outside Stiffeners Continued Figure 6A ...
Страница 34: ...6 Stiffener Details 34 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Stiffener and Seam Locations Figure 6E ...
Страница 78: ...10 Accessories 78 PNEG 1510 Top Dry 24 30 and 36 Manual Batch 2 Ring Door Assembly Figure 10B ...
Страница 80: ...10 Accessories 80 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Optional Bin Step Assembly WD 042 Figure 10C ...
Страница 82: ...82 PNEG 1510 Top Dry 24 30 and 36 Manual Batch NOTES ...