background image

English (GB)

8

English (GB) Installation and operating instructions

Original installation and operating instructions.

CONTENTS

Page

1. Symbols used in this document

2. General

On page 341 of these installation and operating 
instructions, you will find copies of the pump and 
motor nameplates.

Before the SQ/SQE pump is lowered into the 
borehole, this page should be filled in with the 
relevant nameplate data. 

These installation and operating instructions must be 
kept in a dry place near the installation site for 
reference purposes.

2.1 Applications

The SQ and SQE pumps are designed for pumping 
thin, clean, non-aggressive, non-explosive liquids, 
not containing solid particles or fibres.

Typical applications:

Groundwater supply for

– private housing

– small waterworks

– irrigation systems in for instance green houses.

Liquid transfer in tanks.

Pressure boosting.

1.

Symbols used in this document

8

2.

General

8

2.1

Applications

8

3.

Technical data

9

3.1

Storage

9

3.2

Sound pressure level

9

4.

Preparation

10

4.1

Refilling of motor liquid

10

4.2

Positional requirements

10

4.3

Liquid temperatures/cooling

10

5.

Electrical connection

11

5.1

General

11

5.2

Motor protection

12

5.3

Connection of motor

12

6.

Installation

12

6.1

General

12

6.2

Assembly of pump part and motor

12

6.3

Removal of non-return valve

12

6.4

Fitting the cable plug to the motor

13

6.5

Fitting the cable guard

13

6.6

Cable sizing

14

6.7

Fitting the submersible drop cable

14

6.8

Pipework connection

15

7.

Start-up

16

8.

Operation

16

8.1

Minimum flow rate

16

8.2

Selection of diaphragm tank and setting 
of precharge pressure and pressure 
switch

16

8.3

Built-in protection

17

9.

Maintenance and service

17

9.1

Contaminated pumps

17

10.

Fault finding chart

18

10.1

Megging

19

11.

Checking the power supply

20

12.

Environment

20

13.

Disposal

20

Warning

Prior to installation, read these 
installation and operating instructions. 
Installation and operation must comply 
with local regulations and accepted 
codes of good practice.

Warning

The use of this product requires 
experience with and knowledge of the 
product.
Persons with reduced physical, 
sensory or mental capabilities must not 
use this product, unless they are under 
supervision or have been instructed in 
the use of the product by a person 
responsible for their safety.
Children must not use or play with this 
product.

Warning

If these safety instructions are not 
observed, it may result in personal 
injury!

Caution

If these safety instructions are not 
observed, it may result in malfunction 
or damage to the equipment!

Note

Notes or instructions that make the job 
easier and ensure safe operation. 

Содержание SQE-NE Series

Страница 1: ...on 12 6 1 General 12 6 2 Assembly of pump part and motor 12 6 3 Removal of non return valve 12 6 4 Fitting the cable plug to the motor 13 6 5 Fitting the cable guard 13 6 6 Cable sizing 14 6 7 Fitting...

Страница 2: ...ator As a minimum the generator output must be equal to the motor P1 kW 10 Starting current The motor starting current is equal to the highest value stated on the motor nameplate Power factor PF 1 Mot...

Страница 3: ...ng a screwdriver or a similar tool 4 Inject motor liquid into the motor with a filling syringe or the like 5 To allow possible air to escape move the motor from side to side 6 Refit the filling plug a...

Страница 4: ...arked with the following symbol Supply voltage 1 x 200 240 V 10 6 50 60 Hz PE The current consumption can only be measured by means of a true RMS instrument If other instruments are used the value mea...

Страница 5: ...be used on the clamping faces of the pump part See fig 6 Fig 6 When pump part and motor have been assembled correctly there must not be a clearance between pump part and motor 6 3 Removal of non retur...

Страница 6: ...earance between the motor and the cable plug 6 5 Fitting the cable guard To fit the cable guard proceed as follows 1 Make sure that the submersible drop cable lies flat in the cable guard 2 Place the...

Страница 7: ...Fitting the submersible drop cable It is recommended to join the submersible drop cable and the motor cable by means of a Grundfos cable termination kit type KM For larger cross sections please contac...

Страница 8: ...lation depths Maximum installation depth below the static water level 150 metres See fig 11 Minimum installation depths below the dynamic water level Vertical installation During start up and operatio...

Страница 9: ...switch and diaphragm tank during starting will be lower than the pump cut in pressure set on the pressure switch pcut in This lower pressure is called minimum pressure pmin pmin is equal to the desir...

Страница 10: ...ce tools are available from Grundfos The Grundfos Service Manual is available on request The pumps can be serviced at a Grundfos service centre 9 1 Contaminated pumps If Grundfos is requested to servi...

Страница 11: ...n the electric installation are blown Replace the blown fuses If the new ones blow too the electric installation and the submersible drop cable should be checked b The ELCB or the voltage operated ELC...

Страница 12: ...e is defective Replace the riser pipe i Undervoltage has occurred Check the power supply 4 Frequent starts and stops a The differential of the pressure switch between the start and stop pressures is t...

Страница 13: ...d neutral Connect the voltmeter to the terminals at the connection The voltage should when the motor is loaded be within the range specified in section 5 Electrical connection Large variations in supp...

Отзывы: