background image

English (GB)

16

7. Start-up 

Make sure that the well is capable of yielding a 
minimum quantity of water corresponding to the 
pump capacity.

Do not start the pump until it is completely 
submerged in the liquid.

Start the pump and do not stop it until the pumped 
liquid is completely clean, as otherwise the pump 
parts and the non-return valve may choke up. 

8. Operation

8.1 Minimum flow rate

To ensure the necessary cooling of the motor, the 
pump flow rate should never be set to a value lower 
than 50 l/h.

If the flow rate suddenly falls, the reason might be 
that the pump is pumping more water than the 
borehole can yield. The pump must be stopped and 
the fault corrected.

8.2 Selection of diaphragm tank and 

setting of precharge pressure and 
pressure switch 

As the pump has a built-in soft starter giving a run-up 
time of 2 seconds, the pressure at the pressure 
switch and diaphragm tank during starting will be 
lower than the pump cut-in pressure set on the 
pressure switch (p

cut-in

). This lower pressure is 

called minimum pressure (p

min

). 

p

min

 is equal to the desired minimum pressure at the 

highest tap + head and head loss in the pipe from the 
pressure switch and diaphragm tank to the highest 
tap (p

min

 = B + C). See fig. 12. 

Fig. 12

A: 

Head + head loss from dynamic water level 
to diaphragm tank. 

B: 

Head + head loss from diaphragm tank to 
highest tap. 

C: 

Minimum pressure at highest tap. 

p

pre

: Precharge 

pressure of diaphragm tank. 

p

min

Desired minimum pressure. 

p

cut-in

:  Cut-in pressure set on pressure switch. 

p

cut-out

:  Cut-out pressure set on pressure switch. 

Q

max

Maximum flow at p

min

Caution

The pump dry-running protection is 
effective only within the recommended 
duty range of the pump.

Warning

The installation must be designed for 
the maximum pump pressure.

TM

0

0

 6

445

 3

795

Caution

Make sure that the selected pump can 
deliver a pressure higher than p

cut-out

 

+ A.

C

B

A

Q

p

pre

p

min

p

cut-in

p

cut-out

Q

max

Diaphragm tank

Pressure 
switch

Содержание SQE-NE Series

Страница 1: ...on 12 6 1 General 12 6 2 Assembly of pump part and motor 12 6 3 Removal of non return valve 12 6 4 Fitting the cable plug to the motor 13 6 5 Fitting the cable guard 13 6 6 Cable sizing 14 6 7 Fitting...

Страница 2: ...ator As a minimum the generator output must be equal to the motor P1 kW 10 Starting current The motor starting current is equal to the highest value stated on the motor nameplate Power factor PF 1 Mot...

Страница 3: ...ng a screwdriver or a similar tool 4 Inject motor liquid into the motor with a filling syringe or the like 5 To allow possible air to escape move the motor from side to side 6 Refit the filling plug a...

Страница 4: ...arked with the following symbol Supply voltage 1 x 200 240 V 10 6 50 60 Hz PE The current consumption can only be measured by means of a true RMS instrument If other instruments are used the value mea...

Страница 5: ...be used on the clamping faces of the pump part See fig 6 Fig 6 When pump part and motor have been assembled correctly there must not be a clearance between pump part and motor 6 3 Removal of non retur...

Страница 6: ...earance between the motor and the cable plug 6 5 Fitting the cable guard To fit the cable guard proceed as follows 1 Make sure that the submersible drop cable lies flat in the cable guard 2 Place the...

Страница 7: ...Fitting the submersible drop cable It is recommended to join the submersible drop cable and the motor cable by means of a Grundfos cable termination kit type KM For larger cross sections please contac...

Страница 8: ...lation depths Maximum installation depth below the static water level 150 metres See fig 11 Minimum installation depths below the dynamic water level Vertical installation During start up and operatio...

Страница 9: ...switch and diaphragm tank during starting will be lower than the pump cut in pressure set on the pressure switch pcut in This lower pressure is called minimum pressure pmin pmin is equal to the desir...

Страница 10: ...ce tools are available from Grundfos The Grundfos Service Manual is available on request The pumps can be serviced at a Grundfos service centre 9 1 Contaminated pumps If Grundfos is requested to servi...

Страница 11: ...n the electric installation are blown Replace the blown fuses If the new ones blow too the electric installation and the submersible drop cable should be checked b The ELCB or the voltage operated ELC...

Страница 12: ...e is defective Replace the riser pipe i Undervoltage has occurred Check the power supply 4 Frequent starts and stops a The differential of the pressure switch between the start and stop pressures is t...

Страница 13: ...d neutral Connect the voltmeter to the terminals at the connection The voltage should when the motor is loaded be within the range specified in section 5 Electrical connection Large variations in supp...

Отзывы: