Installation
26 | 74
BA_
T
D
3-
BM
001e
n_
01
4_D
e
lta-
p.
docx
5.1.2
Requirements on the electrical wiring
● Push socket with earthing contact within approx. 1.2 m of the control unit.
● Push socket with earthing contact must carry continuous voltage.
CAUTION:
The electrically operated valves do not close automatically If
there is a power failure.
● Until intervention by the operator, flow of water through the drain
outlet or the brine tank.
► Socket must carry continuous voltage. Do not connect the socket
with lighting and heating switches.
► In case of power failure, check the water softener and shut-off the
water supply, if necessary.
5.2
Checking the scope of supply
No.
Designation
No.
Designation
1
Cover
4
Exchanger bottles
2
Water test kit "Total hardness“
5
Central control valve in parts and control unit
3
Operation manual
6
Brine tank
Check the scope of supply for completeness and possible damage.
Содержание Delta-p
Страница 1: ...We understand water Softening Water softener Delta p Operation manual ...
Страница 57: ...Mounting instructions 57 74 BA_TD3 BM001en_014_Delta p docx ...
Страница 58: ...Mounting instructions 58 74 BA_TD3 BM001en_014_Delta p docx ...
Страница 59: ...Mounting instructions 59 74 BA_TD3 BM001en_014_Delta p docx ...
Страница 60: ...Mounting instructions 60 74 BA_TD3 BM001en_014_Delta p docx ...
Страница 62: ...Mounting instructions 62 74 BA_TD3 BM001en_014_Delta p docx ...
Страница 72: ......