GROWSPAN
™
GOTHIC PREMIUM HIGH TUNNELS
2
108179_80_81_82_83_84H Revision date: 01.08.21
READ THIS DOCUMENT BEFORE YOU BEGIN
.
Thank you for purchasing this GrowSpan™ high tunnel.
When properly assembled and maintained, this product will
provide years of reliable service. These instructions include
helpful hints and important information needed to safely
assemble and properly maintain the high tunnel. Please
read these instructions
before
you begin.
If you have any questions during the assembly, contact
Customer Service at 1-800-245-9881 for assistance.
SAFETY PRECAUTIONS
• Wear eye protection.
• Wear head protection.
• Wear gloves when handling metal tubes.
• Use a portable GFCI (Ground Fault Circuit Interrupter)
when working with power tools and cords.
• Do not climb on the high tunnel or framing during or
after construction.
• Do not occupy the high tunnel or attempt to install the
panel during high winds, tornadoes, or hurricanes.
•
Never
attempt to install the panel during windy or
stormy conditions.
• Assemble and anchor the high tunnel frame.
• Provide adequate ventilation if the structure is
enclosed.
• Do not store hazardous materials in the high tunnel.
• Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this high tunnel, please read the
MUST
READ
document included with the shipment.
WARNING:
The anchor assembly is an integral part of
the high tunnel construction. Improper anchoring may
cause high tunnel instability and failure of the structure.
Failing to anchor the high tunnel properly
will void the
manufacturer’s warranty
and may cause serious injury
and damage.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure. Follow these
requirements:
• Never erect the structure under power lines.
• Identify whether underground cables and pipes are
present
before
preparing the site or anchoring the
structure.
• Location should be away from structures that could
cause snow to drift on or around the building.
• Do not position the high tunnel where large loads
such as snow and ice, large tree branches, or other
overhead obstacles could fall.
•
Always check local building codes before you begin.
SITE
After choosing a location, proper preparation of the site is
essential. The following site characteristics will help
ensure the integrity of the structure.
•
A level site is required
. The site must be level to
properly and safely erect and anchor the structure.
• If the site is not level, use footings to provide a secure
base to assemble the structure. Pre-cast concrete
blocks, pressure-treated wood posts, or poured
footings are all acceptable when properly used. (Some
high tunnels use ground posts or base plates.)
• Drainage: Water draining off the structure and from
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING:
The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed during
the assembly process. For safety reasons, those who
are not familiar with recognized construction methods
and techniques
must seek the help of a qualified
contractor.
CUSTOMER-SUPPLIED MATERIALS
Dimension lumber for the ribbon board, retaining board,
and baseboard may be required depending on the high
tunnel sidewall panel option.
Consult pages 5-6 for additional details and diagrams.