Step 4 Insert power cables and network cable into battery terminals

1. Measure battery voltage with a multi-meter and ensure the

voltage output is 0V under power-off mode.

2. Plug one end of the power cables that have been made in

Section 4.2 step 2 into DC breaker, and plug the other end
into the  battery  terminals.

3. Plug network cable A that has been made in Section 4.2

step 3 into a network terminal of battery (labelled as PCS),
and plug the other end of network cable A into network
port of PCS.

to PCS Network Plug

Plug 1

to DC Breaker 
Positive Terminal

to DC Breaker 
Positive Terminal

Plug 2

.

.

A manually operating breaker should be installed between battery and 
PCS to control the main circuit during installation, wire connection and 
maintenance.  The breaker can be operated manually without using any 
tool and should be located near the battery.  The distance between battery 
and the breaker should comply with local regulations. Each battery shall 

be equipped with a two-pole DC breaker.   

!

WARNING

5 Installation Steps under Parallel Connection

Step 1 Install battery.

If voltage difference is measured more than 1V, the difference shall be 
adjusted to be less than 1V either by charging the battery with lower 
voltage or discharging the battery with higher voltage before conducting 
the parallel-connected installation. If two or more batteries are connected 
in parallel, the same quantity of two-pole DC breakers are required 
between batteries and the inverter.

Step 3 Insert power cables into battery terminals.

Power on batteries in condition of no load, measure their voltages with a 
multi-meter and confirm the voltage difference not more than 0.5V. After 
that, power off batteries and install them according to the procedures 
specified in Section 3.3.

!

WARNING

Make the power cables of batteries based on Section 4.2 Step 2. Plug one 
end of positive and negative terminals into DC breaker. Respectively 
measure the positive and negative terminal blocks of each battery with 
a multi-meter, and ensure the voltage outputs under off mode are all 
0V.  After that, plug the other end of power cables into battery terminals. 
Connect DC Breakers with PCS.

Step 2:

Fasten ground terminal and grounding 
cable with M6 screw for two batteries.

Содержание GBLI 6532

Страница 1: ...Date 2020 Version V 0...

Страница 2: ...er Version Date 1 N A Chen Le Shen Zhengbin Li Bing Guo Yihao V1 0 2020 07 24 2 Added the icon read the manual before operating Updated the caution about the two pole breaker Wang Qian Shen Zhengbin G...

Страница 3: ...or or moderate injury Symbol Description WARNING CAUTION Table of Contents 1 Safety 1 1 1 Warning Label 1 1 2 Precautions 2 1 3 Responses to Emergencies 2 1 4 Storage safety 3 1 5 Transportation Safet...

Страница 4: ...on area Risk of electric shock Explosive gas Battery may leak corrosive electrolyte Battery is heavy enough to cause severe injury 1 Safety 1 1 Warning Label Do not reverse polarities Do not expose ba...

Страница 5: ...is dangerous and must be handled with utmost care They are not usable for use and could pose a safety threat to people or property If battery is suspected to be damaged stop any operation and return...

Страница 6: ...ests and Criteria and SN T 0370 2 2009 Part 2 Performance Test of the Rules for the Inspection of packaging for Exporting Dangerous Goods The battery is classified as class 9 dangerous goods and is su...

Страница 7: ...2 2 Function Compared with normal batteries the battery is characterized with better charging and discharging performance longer cycle life and less self discharging loss The build in BMS can monitor...

Страница 8: ...harging Current temperature refere to the cell surface temperature 10 0 21 3A 0 45 104 2A 45 50 85 3A 50 55 32A 9 Norminal Charging and Discharging powern 3 3KW 10 Short Circuit Current 2200A 4ms 11 M...

Страница 9: ...Ground Wall Wall Ground 5 5 500 d 1200 90 500 d 1200 500 d 1200 It is recommended to build sunshade rain shelter to avoid direct exposure to sunlight and rain 3 2 Installation Required Tools Drill Cri...

Страница 10: ...racket to wall Choose alloy drill bit with a diameter of 12mm and install it to a drill Drill in the spots that have been located in step 1 and have at least 60mm drilling depth Clean the soil and dri...

Страница 11: ...ntil the notch locks limiting pin rotate the right latch leftward until the notch locks limiting pin too Leave a minimum clearance of 133mm before the front surface of battery In order to guarantee a...

Страница 12: ...in the drill Drill two holes in the spots that have been confirmed in step 1 Keep the drilling depth as least 60mm Clean the soil and drive expansion tube into hole Move battery back to the place conf...

Страница 13: ...GND ISO 5 Master Select 6 GND ISO 7 GND ISO 8 WKP OUT Item No Link Out 1 COM CANH 2 COM CANL 3 Encode OUT 4 GND ISO 5 Slave Last 6 GND ISO 7 GND ISO 8 WKP OUT 3 Press connecting part with a hydraulic...

Страница 14: ...crimper 4 Connect RJ45 plug with joint sleeve and tighten up sealing sealing nut and joint sleeve 2 Network cable adopts standard 8 core cable Insert eight wires into RJ45 plug Ensure the color of wi...

Страница 15: ...on Steps under Parallel Connection Step 1 Install battery If voltage difference is measured more than 1V the difference shall be adjusted to be less than 1V either by charging the battery with lower v...

Страница 16: ...battery Batteries undergone less than 300 cycles are defined as new batteries WARNING 6 Power on off Battery 6 1 LED Indication There are many technical contents involved in the electrification proce...

Страница 17: ...75 0 SOC 75 1 99 9 SOC 100 SOC Discharge Standby 100 75 1 75 0 50 1 50 0 25 1 25 0 0 LED Indicator light Status Description Dispaly Logics Battery Status Description Light Indication LED1 LED2 LED3 L...

Страница 18: ...n 2 Press POWER button of any battery for two seconds and observe the LED indication on two panels 1 If RUN and SOC lights on both batteries turn on normal and the RUN lights on both batteries flicker...

Страница 19: ...kage zip and decompress it 2 Enter BMS Installation package Volume double click setup exe and run it 3 Execute the default configuration until completing the installation Step 2 Make sure the battery...

Страница 20: ...de file 4 Click Start to Upgrade 5 Upgrade succeeds when progress bar reaches 100 T 86 0755 2747 1942 E service ginverter com W www ginverter com Address No 28 Guangming Road Shiyan Street Bao an Dist...