background image

4

2. Introduction to Product

2.1 Intended Purpose

The battery is a 6.5kWh LiFePO4 pack. It has a 48V battery module as 
the main power supply unit which composed of 32 pieces of 64Ah cells 
in two parallel and sixteen serial connect (2P16S). Battery coordinates 
with PV, PCS, Grid, DC Breaker and loads in the residential energy 
storage system. The four typical application scenarios are as shown 

Battery powers loads at nighttime 
when there is no PV. If battery 
energy is insufficient, it can 
supply loads together with grid.

Battery can be charged by grid. 
Users are suggested to store 
energy from grid to battery when 
electricity price is relatively lower.

 

Power-off triggered by fault: battery powers off if level three 

               under voltage, 0V cell or parallel connection failure happens.

 

Forced power-off: when battery does not connect to mains  

               supply, press POWER button for two seconds and battery   
               powers off. 

 

Activation: input 48V-57.6V/2S-5S via P+/P- terminals, battery will 

               be activated from off mode to standby status.

2.3 Appearance

The battery is an energy storage unit composed of cells, mechanical 
parts, battery management system (BMS) as well as power and signal 
terminals. Product dimension (unit: mm) and appearance are as 
shown below:

2.2 Function

Compared with normal batteries, the battery is characterized with 

better charging and discharging performance, longer cycle life and 
less self-discharging loss. The build-in BMS can monitor battery 
operation status and alarm timely to avoid operation out of limit. A 
maximum of 8  batteries can be parallel-connected to expand energy 
and power of energy storage system. Battery realizes communication 
with PCS via CAN or RS485 network port.

 

Monitoring: detect the voltage and temperature of cell, the  

               voltage and current of battery.

 

SOC estimate: indicate the precise volume of remaining 

               electricity.

 

Alarm: alarm when overvoltage, under voltage, overcurrent,   

               over temperature or under temperature occurs.

 

Protection: protect against over voltage, under voltage, over  

               current, over temperature, under temperature, cell fault and 
               hardware failure.

 

Report: report alarm messages and operation data to PCS via 

               CAN or RS485 network ports.

 

Parallel connection: support a maximum of 8 batteries in 

               parallel connection.

The energy produced by PV is 
optimized to supply loads. The 
excess energy is used to charge 
battery, then export to grid.

When grid falls, battery and PV 
can power loads.

Each battery shall be equipped with an two-pole DC breaker as:
Rated Voltage ≥ 120Vdc                  Rated Current ≥ 150A    
Cut-off current: 2200A

!

CAUTION 

Breakers are provided by your system supplier. 
The quantity of breakers must be consistent with that of the battries.

Содержание GBLI 6532

Страница 1: ...Date 2020 Version V 0...

Страница 2: ...er Version Date 1 N A Chen Le Shen Zhengbin Li Bing Guo Yihao V1 0 2020 07 24 2 Added the icon read the manual before operating Updated the caution about the two pole breaker Wang Qian Shen Zhengbin G...

Страница 3: ...or or moderate injury Symbol Description WARNING CAUTION Table of Contents 1 Safety 1 1 1 Warning Label 1 1 2 Precautions 2 1 3 Responses to Emergencies 2 1 4 Storage safety 3 1 5 Transportation Safet...

Страница 4: ...on area Risk of electric shock Explosive gas Battery may leak corrosive electrolyte Battery is heavy enough to cause severe injury 1 Safety 1 1 Warning Label Do not reverse polarities Do not expose ba...

Страница 5: ...is dangerous and must be handled with utmost care They are not usable for use and could pose a safety threat to people or property If battery is suspected to be damaged stop any operation and return...

Страница 6: ...ests and Criteria and SN T 0370 2 2009 Part 2 Performance Test of the Rules for the Inspection of packaging for Exporting Dangerous Goods The battery is classified as class 9 dangerous goods and is su...

Страница 7: ...2 2 Function Compared with normal batteries the battery is characterized with better charging and discharging performance longer cycle life and less self discharging loss The build in BMS can monitor...

Страница 8: ...harging Current temperature refere to the cell surface temperature 10 0 21 3A 0 45 104 2A 45 50 85 3A 50 55 32A 9 Norminal Charging and Discharging powern 3 3KW 10 Short Circuit Current 2200A 4ms 11 M...

Страница 9: ...Ground Wall Wall Ground 5 5 500 d 1200 90 500 d 1200 500 d 1200 It is recommended to build sunshade rain shelter to avoid direct exposure to sunlight and rain 3 2 Installation Required Tools Drill Cri...

Страница 10: ...racket to wall Choose alloy drill bit with a diameter of 12mm and install it to a drill Drill in the spots that have been located in step 1 and have at least 60mm drilling depth Clean the soil and dri...

Страница 11: ...ntil the notch locks limiting pin rotate the right latch leftward until the notch locks limiting pin too Leave a minimum clearance of 133mm before the front surface of battery In order to guarantee a...

Страница 12: ...in the drill Drill two holes in the spots that have been confirmed in step 1 Keep the drilling depth as least 60mm Clean the soil and drive expansion tube into hole Move battery back to the place conf...

Страница 13: ...GND ISO 5 Master Select 6 GND ISO 7 GND ISO 8 WKP OUT Item No Link Out 1 COM CANH 2 COM CANL 3 Encode OUT 4 GND ISO 5 Slave Last 6 GND ISO 7 GND ISO 8 WKP OUT 3 Press connecting part with a hydraulic...

Страница 14: ...crimper 4 Connect RJ45 plug with joint sleeve and tighten up sealing sealing nut and joint sleeve 2 Network cable adopts standard 8 core cable Insert eight wires into RJ45 plug Ensure the color of wi...

Страница 15: ...on Steps under Parallel Connection Step 1 Install battery If voltage difference is measured more than 1V the difference shall be adjusted to be less than 1V either by charging the battery with lower v...

Страница 16: ...battery Batteries undergone less than 300 cycles are defined as new batteries WARNING 6 Power on off Battery 6 1 LED Indication There are many technical contents involved in the electrification proce...

Страница 17: ...75 0 SOC 75 1 99 9 SOC 100 SOC Discharge Standby 100 75 1 75 0 50 1 50 0 25 1 25 0 0 LED Indicator light Status Description Dispaly Logics Battery Status Description Light Indication LED1 LED2 LED3 L...

Страница 18: ...n 2 Press POWER button of any battery for two seconds and observe the LED indication on two panels 1 If RUN and SOC lights on both batteries turn on normal and the RUN lights on both batteries flicker...

Страница 19: ...kage zip and decompress it 2 Enter BMS Installation package Volume double click setup exe and run it 3 Execute the default configuration until completing the installation Step 2 Make sure the battery...

Страница 20: ...de file 4 Click Start to Upgrade 5 Upgrade succeeds when progress bar reaches 100 T 86 0755 2747 1942 E service ginverter com W www ginverter com Address No 28 Guangming Road Shiyan Street Bao an Dist...

Отзывы: