Step 4 Insert network cables into battery terminals.
Make network cables based on Section 4.2 step 3. Connect two
batteries with Network Cable B, and connect battery and PCS
with Network Cable A.
Specifically, Plug one end of Network Cable A into network port
of battery 1 (labelled as PCS), plug the other end into the network
port of PCS. Plug one end of Network Cable B into Link-Out of
the Battery 1 and the other end into Link-In of Battery 2. Insert
one plug into Link-In of the Battery 1 and the other plug into the
Link-Out of Battery 2.
.
.
to PCS
Network
Port
Plug 1
Plug 2
Battery 1
Battery 2
to PCS Positive
Terminal
to PCS Negative
Terminal
Battery 1
Battery 2
Ensure batteries in parallel connection are from the same batch, same
model and same manufacturer. Do not mix an old battery with a new
battery. Batteries undergone less than 300 cycles are defined as new
batteries.
!
WARNING
6 Power on/off Battery
6.1 LED Indication
There are many technical contents involved in the electrification process,
and technicians must go through technical training and obtain
certificates in compliance with local laws and regulations.
Please stand on dry insulating objects and do not wear metal objects
such as watches, rings and necklaces during operation. Insulating
tools should be used.
Do not contact with two charged positions with a potential difference.
If other people are not allowed to operate, the prohibition sign
should be hung on the distribution equipment: "No closing,
someone operating."
Make sure to turn off breaker before checking battery.
Measure battery voltage with a multi-meter and ensure voltage
output under off mode is 0V.
If any abnormality is detected when powering on, immediately
power off the battery. Proceed again only after causes are confirmed.
LED 1
LED 2
LED 4
LED 5
LED 3
!
WARNING