CONDENSINOX -
Installation, Use and Maintenance
AVS75
QX21
N
QX22
N
QX23
BX21
Gnd
BX22
Gnd
H2
Gnd
}
}
}
AVS75
QX21
N
QX22
N
QX23
BX21
Gnd
BX22
Gnd
H2
Gnd
}
}
}
AVS75
QX21
N
QX22
N
QX23
BX21
Gnd
BX22
Gnd
H2
Gnd
}
}
}
}
}
}
Module 1
Module 2
Module 3
Regulated circuit flow sensor B1
Regulated circuit flow sensor B12
Regulated circuit flow sensor B14
Heating circuit 1 mixing
valve Y1/Y2
Heating circuit 2 mixing
valve Y5/Y6
Heating circuit 3 mixing
valve Y11/Y12
Heating circuit 1 circulating
pump Q2
Heating circuit 2 circulating
pump Q6
Heating circuit 3 circulating
pump Q20
D. SPECIFIC START-UP PROCEDURE
"
Fit and connect the accessories.
"
Start up the boiler alone.
"
Make the following adjustments:
Line No. Value
• Menu
Time and date
Set the time
Hour / minute (1) HH.MM
Set the date
Day / month (2) DD.MM
Set the year
Year (3) YYYY
• Menu
Configuration
Start heating circuit 1
Heating circuit 1 (5710)
On
Start heating circuit 2
Heating circuit 2 (5715)
On
ATTENTION:
Configure the switches correctly for the AVS75 extension modules.
Diagram: CX4