OM/SM-TDH-CE
19
5.2 Lighting and Operation
5.2.1
Initial Kettle Lighting and Operational
Readiness Check
After the TDH Kettle has been installed according to
service and installation instructions, perform initial
start-up as a test to ensure that the unit is operating
correctly. Follow the steps below. TDH steam
jacketed kettle controls and indicators are identified
in the drawing below.
a) Remove all literature and packing material from
the interior and exterior of the unit.
b) Make sure gas and electricity supplies are
turned on.
c)
Ensure that the kettle is filled with water before
lighting.
d) Check the water level in the jacket. The level
should be between the lines on the gauge glass.
If the level is low, the jacket water level will be
required to be topped up. (This will require a
service call).
e) Check the pressure gauge. If the gauge does
not show sufficient vacuum (20 to 30 below zero)
the jacket will require venting. (This will require
a service call).
f)
Switch the On/Off switch to the "On" position.
The “power on” neon will illuminate.
g.
Turn the thermostat dial to the required setting.
h.
After 10-15 seconds the burners should light.
The "heat on" neon will illuminate.
i.
In the event the burners do not light, or go out as
indicated by the illumination of the lockout
indicating neon, turn the unit off. Wait
approximately one minute. Press lockout reset
switch and repeat steps (f) to (g).
WARNING
AVOID CONTACT WITH FLUE. SURFACES ARE
VERY HOT AND WILL CAUSE BURNS.
DO NOT OBSTRUCT FLUE EXHAUST OPENING.
5.2.2 To Shut Down Kettle
a.
Turn the thermostat dial to the “Off” position
b.
Turn the On/Off switch to the “Off” position
c.
For a prolonged shut down:
Follow steps a and b. Turn off the gas and
electricity mains.