background image

COM

PRESSURE SWITCH

SPARK IGNITION MODULE

L2

BLK

RED

C

CUT OFF

LOW WATER

NO

WHT

L1

GAS SUPPLY

LLCO

GRN

YEL

TO PILOT

SPARK

24 V GND

24 V

BURNER GND

HIGH LIMIT

GRN

COM

COM

YEL

YEL

MV

PV

MV/PV

MV

RED

PILOT SPARK IGNITER

N.C.

PV

BLK

GAS CONTROL

VALVE

MV

PV

RED

THERMOSTAT

A

24V

3

120V

COM

GRN

F1

G

LOW WATER

PROBE

NC

HEAT

RED

GRN

GRN

ORG

GRN

RED

P/N 137925 REV. A

P/N 137487

P/N 122192

P/N 085153

TERMINAL BLOCK

P/N 106234

4A

TRANSFORMER

TOGGLE SWITCH

75VA

ON/OFF

RED

24V

RED

3

BLK

F1

WHT

240V

GRN

COM

LOAD

24V

RED

GRN

208V

COM

24V

GRN

POWER ON

R

A

LOW WATER

RED

BLK

ORG

TRANSFORMER

20VA

4A

24V

COM

24V

LOAD

24V

TOGGLE SWITCH

ON/OFF

RED

120V

208/240V

Electrical Schematic

21

Содержание AHS-40

Страница 1: ...DERSTAND AND FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED IN THIS MANUAL FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLI...

Страница 2: ...ARE HARMFUL TO THE SKIN EYES MUCOUS MEMBRANES AND CLOTHING TAKE PRECAUTIONS WEAR RUBBER GLOVES GOGGLES OR FACE SHIELD AND PROTECTIVE CLOTHING CAREFULLY READ WARNINGS AND FOLLOW DIRECTIONS ON CLEANER...

Страница 3: ...INTERNATIONAL 789 N Dixboro Rd P O Box 130140 Ann Arbor Michigan 48113 0140 KLENZADE SALES CENTER ECOLAB Inc 370 Wabasha St Paul Minnesota 55102 ZEP MANUFACTURING CO 1310 T Seaboard Industrial Blvd At...

Страница 4: ...appening inside the unit These are a Water level sight glass Indicates whether there is enough water in the steam jacket b Pressure vacuum gauge Shows steam pressure and whether too much air has enter...

Страница 5: ...vy box Inspect the box carefully for damage Open the container and check the unit for hidden damage Report shipping damage or shipment errors to the delivery agent Write down the model number serial n...

Страница 6: ...ent the operation of the unit if the exhaust fan is not operating or if the fire suppression system is activated Failure to follow these instructions can cause bodily injury and or property damage 6 T...

Страница 7: ...o or less than 1 2 PSIG 3 45kPa During pressure testing of the gas gas supply piping system at pressures equal to or less than 1 2 PSIG the kettle must be isolated from the gas supply piping system cl...

Страница 8: ...COMBUSTIBLE MATERIALS DO NOT ATTEMPT TO LIGHT ANY BURNER WITH A FLAME CAUTION HEATING AN EMPTY KETTLE MAY CAUSE THE RELEASE OF STEAM FROM THE SAFETY VALVE 1 To Start Kettle a CHECK THE WATER LEVEL IN...

Страница 9: ...ER CAUTION DO NOT OVERFILL THE KETTLE WHEN COOKING HOLDING OR CLEANING KEEP LIQUIDS 2 3 5 8 cm BELOW THE KETTLE RIM TO ALLOW CLEARANCE FOR STIRRING BOILING PRODUCT AND SAFE TRANSFER C An optional kett...

Страница 10: ...pilot flame is not sensed within 90 seconds after spark begins a timer shuts down the entire operation To attempt a second trial for ignition turn off the power switch Check the gas supply valves and...

Страница 11: ...compound as instructed by the supplier Clean the unit thoroughly A cloth moistened with cleaning solution can be used to clean controls housing electrical conduit etc b Rinse the kettle thoroughly wi...

Страница 12: ...er directions Rinse and drain the unit thoroughly before further use m If especially difficult cleaning problems persist contact your cleaning product supplier for assistance The supplier has a traine...

Страница 13: ...plement to pull the ring will help you avoid contact with the steam 3 Jacket Filling Every day before you turn on the unit make sure the water level is approximately in the center of the water gauge g...

Страница 14: ...Auth Service Rep Only b Thermostat calibration c Thermostat operation The thermostat should click when the dial is rotated to settings above and below the temperature of the kettle Kettle stops heatin...

Страница 15: ...valve on gas valve Repair or replace as necessary d That the pilot spark gap is located in the pilot gas stream If not adjust or replace the pilot burner e For drafts Shield the pilot burner if neces...

Страница 16: ...16 Parts List AHS...

Страница 17: ...Chain Single Jack Link 16 600 long 009009 Nipple 1 2 NPT x Close 008877 Screw Sheet Metal pan hd 12 x 1 2 lg 008769 Valve Gate 1 2 NPT 004180 Bracket faucet Mounting 16 Ga x 4 3 4 009054 Label Warnin...

Страница 18: ...ur Groen Certified Service Agency Supply the model designation part description and number quantity and where applicable voltage and phase Burner Assembly AHS 40 Propane 140062 ASM Burner Manifold Pro...

Страница 19: ...Panel Assembly Electri Front Panel Components Assembly Parts List To order parts contact your Groen Certified Service Agency Supply the model designation part description and number quantity and where...

Страница 20: ...ing Assembly 139060 13 Fittings Sight Glass Assembly 002845 1 139187 Front Panel Components 14 Guard Rod for Gauge Glass 002981 2 122192 1 Label Indicator Lights Instructions 123803 15 Nut Hex 10 24 0...

Страница 21: ...NTROL VALVE MV PV RED THERMOSTAT A 24V 3 120V COM GRN F1 G LOW WATER PROBE NC HEAT RED GRN GRN ORG GRN RED P N 137925 REV A P N 137487 P N 122192 P N 085153 TERMINAL BLOCK P N 106234 4A TRANSFORMER TO...

Страница 22: ...Serial No __________________________________ Location ___________________________________ Date Purchased _____________________________ Date Installed _______________________________ Purchase Order No...

Страница 23: ...r fifteen 15 months from date of shipment from Groen IV This warranty does not cover boiler maintenance calibration periodic adjustments as specified in operating instructions or manuals and consumabl...

Отзывы: