-48-
g0554 gear-head Floor lathe
coolant System
the coolant pump and reservoir are located in the
base under the cover on the right hand side of the
base (see
Figure 83).
To perform regular maintenance on the cool-
ant system:
1. remove the access cover.
2. empty the old coolant and remove large
chips from 1st and 2nd stage separators.
Clean out any remaining debris.
3. Fill the reservoir with approximately three
gallons of coolant solution. Closely follow the
coolant manufacturer's instructions for mix-
ing.
Figure 83. Coolant pump and reservoir.
4. open the valve on the coolant nozzle.
5. turn the coolant pump
ON
to prime the cool-
ant system and to see if the coolant is cycling
properly.
6. replace the access cover.
biOLOGicAL
AND
pOiSON HAzARD! use
proper personal protection
equipment when handling
cutting fluid and dispose
by following federal, state,
and fluid manufacturer
requirements to properly
dispose of cutting fluid.
Содержание G0554
Страница 61: ...G0554 Gear Head Floor Lathe 57 A A B C E E Headstock Assembly...
Страница 62: ...58 G0554 Gear Head Floor Lathe 6 7 Headstock Assembly...
Страница 63: ...G0554 Gear Head Floor Lathe 59 H H H 8 9 Headstock Assembly...
Страница 66: ...62 G0554 Gear Head Floor Lathe 9 8 7 6 Gearbox Assembly...
Страница 67: ...G0554 Gear Head Floor Lathe 63 Gearbox Assembly...
Страница 68: ...64 G0554 Gear Head Floor Lathe Gearbox Assembly...
Страница 82: ...78 G0554 Gear Head Floor Lathe Stand Breakdown...
Страница 84: ...80 G0554 Gear Head Floor Lathe 8 Vc Z ZVg 8 Vc Z ZVg ZVYhidX ZVgWdm End Gear Assembly...
Страница 86: ...82 G0554 Gear Head Floor Lathe Steady Follow Rest Assemblies...
Страница 93: ......