![GREAT PLAINS Yield-Pro YP4025A-48TR20 Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/great-plains/yield-pro-yp4025a-48tr20/yield-pro-yp4025a-48tr20_operators-manual_2259532066.webp)
2019-03-19
411-198M
YP4025A-48TR20
Operating Instructions
62
Field Set-Up Checklists
Use the following tables to develop a final checklist for
your tractor/product configuration. Additional or fewer
steps may be necessary depending on tractor features,
product options and planting accessories.
Mechanical Checklist
Page
Tongue height preset on 3-point
Product unfolded
Tongue front latch hook engaged
Transport locks moved to storage.
Caster locks set to FIELD
(extreme hillsides only)
Side-to-side level at gauge wheels
Marker initial length set
Marker disk angle set
Electrical Checklist
Page
Verify electrical hookups solid
Check seed monitor terminal and observe any
diagnostic messages
See
a
a. Refer to monitor manual.
With hydraulic circuits in Neutral, check switches
and indicator lights on Clutch Folding Module
switch panel. Confirm Master OFF.
-
Verify that, when product is lowered, radar speed
sensor is pointed at ground, at an angle
approximately 35
below horizontal.
See
b
b. Refer to sensor documentation.
Air System Checklist
Page
Manifold to seed box or hopper seal
-
Add 1 cup of seed lubricant to each air box, prior
to first use, and prior to loading seed
Seed loaded
Tube gates turned on to correct rows
No air leaks (except from seed box)
-
Hose routings - no sags, no pinches (check
wing-folded & field positions)
-
Hoses fully connected to meters and locked
-
Treatments (Options) Checklist
Page
Confirm Clutch Folding Module “Fert.Pump”
switch OFF
Check tractor-mounted components
See
a
a. Check supplier manual for tanks and pump. Check fertilizer
section of monitor manual.
Ground drive wheel, chain
PFC2000 or PFC1600: Execute Tank Cart
Checklist
See
b
b. See PFC2000/PFC1600 Manual (407-158M).
Check for correct orifice plates
See
c
c. Check Seed Rate manual, and manual for fertilizer pump
system.
Fill system with 100 gallons of water, and check
for leaks
-
Check all row unit lines connected, free of kinks,
and discharge tube/nozzles clear
-
Inlet and hose valves open
SmartBox system loaded, powered up
Row Units Checklist
Page
Preset depth handles alike.
Preset down force springs alike, except in tracks.
Set all unit-mounted coulters to
1
/
4
inch
shallower than opener blades.
Check coulter alignment to row
Check closing wheel alignment
Set press wheels alike.
Check action and contact of side depth wheels
Check wheel scraper gaps (if installed)