![GREAT PLAINS Yield-Pro YP4025A-48TR20 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/great-plains/yield-pro-yp4025a-48tr20/yield-pro-yp4025a-48tr20_operators-manual_2259532003.webp)
YP4025A-48TR20
iii
2019-03-19
411-198M
©
Copyright 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2019 All rights Reserved
Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed
for damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products
as it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.
Trademarks of Great Plains Manufacturing, Inc. include: AccuShot, Max-Chisel, Row-Pro,
Singulator Plus, Short Disk, Swath Command, Terra-Tine, Ultra-Chisel, and X-Press.
Registered Trademarks of Great Plains Manufacturing, Inc. include: Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone,
Nutri-Pro, Seed-Lok, Solid Stand, Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo-Max, Turbo-Till, Ultra-Till, Whirlfilter, and Yield-Pro.
Brand and Product Names that appear and are owned by others are trademarks of their respective owners.
Printed in the United States of America
Important Safety Information.................................................1
Safety Decals ....................................................................6
Introduction...........................................................................14
Using This Manual...........................................................14
Definitions.................................................................14
Preparation and Setup .........................................................16
Initial Setup......................................................................16
Post-Delivery/Seasonal Setup.........................................16
Pre-Planting Setup ..........................................................16
Hitching Tractor to Product..............................................17
Electrical Hookup.............................................................19
Hitching with 3-Point.................................................19
Hitching with Hydraulic Tongue (Option)..................20
Raising/Lowering Tongue.........................................20
Parking Stands ................................................................21
Heights and Leveling .......................................................23
Set Tongue Height ...................................................23
Marker Setup ...................................................................24
Operating Instructions .........................................................25
Pre-Start Checklist...........................................................25
Fold/Unfold Lock Overview..............................................25
Unfolding the Product ......................................................26
Raising/Lowering Product................................................28
Raising Product ........................................................29
Lowering Product .....................................................29
Lift Cylinder Lock-Up ................................................30
Re-Phasing Lift System............................................30
Local Float on Hydraulic Tongue..............................30
Folding the Implement Name ..........................................31
Re-phasing Fold System ..........................................33
Transporting the Product .................................................34
Typical Implement Name Weights............................35
Transport Checklist ..................................................36
Loading Materials ............................................................36
Walkboard and Ladder .............................................36
Auxiliary Hydraulics..................................................38
82 bu. Hopper Operation..........................................39
150 bu. Hopper Operation........................................40
Changing the Bulk Box or Hopper............................41
Refuge Hopper Operation ........................................43
Air System Operation ......................................................44
Air System Overview................................................45
Fan Circuit Operation ...............................................46
Fan General Operating Information .........................47
Recommended Fan Speeds ....................................47
Y-Tubes....................................................................48
Airbox Operation ......................................................48
Weight Transfer Operation (Option) ................................49
Monitor Operation............................................................49
Electric Clutch Operation.................................................50
Electric Clutch Lock-Up............................................50
Meter Operation ................................................51
Meter Operation .......................................................51
Fertilizer Systems Overview............................................53
Implement Name Tanks System Diagram ...............54
SML Cart Pump System Diagram ............................57
Fertilizer Systems Operation ...........................................59
Trailer Operations............................................................61
Field Set-Up Checklists ...................................................62
Caster Locks - Field Operations...............................63
Field Operation................................................................64
Marker Unfolding .............................................................65
Marker Unfold (one side)..........................................65
Row Marker Operation .............................................66
Folding the Markers .................................................66
Unusual Marker Operations .....................................66
Monitor Operation............................................................66
Planting ...........................................................................66
Checking Planting Rate...................................................66
Short-Term Parking .........................................................67
Long-Term Storage .........................................................68
Storage: Fertilizer Option .........................................68
Adjustments..........................................................................69
Setting Material Rates .....................................................70
Planting Rate............................................................70