![GREAT PLAINS Yield-Pro YP4025A-48TR20 Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/great-plains/yield-pro-yp4025a-48tr20/yield-pro-yp4025a-48tr20_operators-manual_2259532040.webp)
2019-03-19
411-198M
YP4025A-48TR20
Operating Instructions
36
Transport Checklist
Plan the route. If towing a cart hitched to the product,
plan the route so that no reverse movements will be
necessary. Avoid steep hills. Keep Clearances in
mind. Folded, your implement name may be nearly
15 feet (4.6 m) wide and 13 feet (4 m) high.
Hitch.
Make both electrical and hydraulic connections. See
If markers are unfolded, fold them.
Raise product.
Install lock-up channels on lift cylinders.
Disengage caster locks. See page 32.
Fold and latch lower ladder section. See page 36.
If product wings are unfolded, fold them.
Make sure wing locks are engaged.
3-point hitch:
Lower hitch fully to ensure wings remain locked.
Hydraulic hitch:
Confirm CFM set to Hitch and hitch circuit in Float.
Always have lights on for highway operation.
Comply with all federal, state and local safety laws
when traveling on public roads.
Travel with caution.
Loading Materials
Walkboard and Ladder
Walkboard pin and pivot operation is covered on
The bottom two steps
of the walkboard ladder are a
swing-down section. To release this section, pull the
spring-loaded pin
forward and pull the top of the free
end of the ladder back.
To re-stow the steps, merely swing them up and forward.
The spring-load pin automatically engages.
Machine Damage Risk:
Ladder steps must be locked up before lowering product or
machine damage will occur.
Figure 31
Walkboard Lower Ladder
29321
2
1