![GREAT PLAINS PL5200 Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/great-plains/pl5200/pl5200_operators-manual_2259478026.webp)
Great Plains | 411-825M | 12/07/2020
19
PL5200 Planter
Preparation and Setup
installed on the toolbar coupling before leveling the
planter.
Center Frame Leveling Left-to-Right
1. Hitch the planter to a suitable tractor.
2. Activate the fold hydraulics. Fully unfold the
planter.
3. Set the tractor hydraulic fold circuit to “Neutral”.
4. Insert the wing lock pins on the toolbar coupling.
5. Adjust the tractor hitch so that the center section
toolbar is level. Use a level to check.
6. Check wing for level at the top of the wing toolbar.
Center Frame Leveling Front-to-Back
The planter is designed to operate with the main tool
bar at 26 inches (66 cm) above the planting surface.
1. Remove cylinder locks from lift assist and stow
locks, if equipped.
2. Completely lower the hitch to planting position, or
if configured with lift assist, fully lower the rear of
the planter using hydraulics.
3. Raise the hitch until the toolbar is 26 inches (66
cm) above the planting surface or peaks of
planting bed.
4. Set the tractor 3-point lever stop to set the planter
height at 26 inches (66 cm).
If leveling from peaks of planting bed, it will
necessary to use customer provisioned
blocks to raise the down-stop position of the
lift assist cylinders.
5. Place a carpenter’s level on a side tube of the
center frame. Have an assistant stand a safe
distance away and observe the carpenter’s level.
6. With the hitch lowered to the 26 inches (66 cm)
stop, incrementally raise the lift assist until the
frame is level.
7. Ensure the front tool bar is at 26 inches (66 am)
above planting surface. If not, adjust stop and
repeat until the frame is level.
8. Measure the length of exposed rod on the lift
assist cylinder. Customer must provision two sets
of blocks in the measured length.
9. Fully raise the lift assist and insert the two sets of
customer provisioned blocks.
Wing Leveling
1. Ensure the wing lock pins are installed on the
toolbar coupling, and center frame leveling left-to-
right and front-to-back have been completed.
2. Loosen the jam nut (1) at the upper link arm
adjuster.
3. Remove bolt (2) and rotate lock plate (3) clear of
adjustment nut (4).
4. Rotate the adjustment nut (4) until the wing is
level. Check with level.
5. Secure the jam nut (1).
6. Install the lock plate (3) with bolt (2).
7. Repeat steps for other wing.
36097
25435
i
36097
1
1
4
2
3
36098
Содержание PL5200
Страница 12: ...Great Plains 411 825M 12 07 2020 5 PL5200 Planter Table of Contents Index Safety Information ...
Страница 46: ...Great Plains 411 825M 12 07 2020 39 PL5200 Planter Table of Contents Index Twin Row to Single Row ...
Страница 62: ...Great Plains 411 825M 12 07 2020 55 PL5200 Planter Table of Contents Index Adjustments ...
Страница 66: ...Great Plains 411 825M 12 07 2020 59 PL5200 Planter Table of Contents Index Options ...
Страница 78: ...Great Plains 411 825M 12 07 2020 71 PL5200 Planter Table of Contents Index Maintenance ...
Страница 86: ...Great Plains 411 825M 12 07 2020 79 PL5200 Planter Table of Contents Index Troubleshooting ...
Страница 96: ...Great Plains 411 825M 12 07 2020 89 PL5200 Planter Table of Contents Index Specifications ...
Страница 104: ...Great Plains 411 825M 12 07 2020 97 PL5200 Planter Table of Contents Index Option Installation ...
Страница 106: ...Great Plains 195 612M 12 07 2020 99 26 Foot 2 Section Drill Table of Contents Index Warranty ...
Страница 108: ...Great Plains 411 825M 12 07 2020 101 PL5200 Planter Table of Contents Index ...
Страница 109: ...Table of Contents Index ...
Страница 110: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...