![GREAT PLAINS 3S-3000HD Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/great-plains/3s-3000hd/3s-3000hd_operators-manual_2259383034.webp)
30
3S-3000HD
Great Plains Manufacturing, Inc.
195-068M
2019-03-12
If field operations are planned:
5. Position all six opener transport lock handles in
FIELD position.
6. Completely raise openers to allow opener transport
locks to disengage.
Note: The opener transport lock handles are spring load-
ed and can be moved to field position with openers
up or down, but locks will only disengage when
openers are completely raised. There are two lock
handles on each drill section.
Folding and Unfolding Quick Reference
To Fold Drill for Transport
• Fold markers (page 42).
• Raise openers (page 23).
• Fold drill (page 24).
• Raise drill (page 25).
To Unfold Drill for Field
• Lower drill (page 29).
• Unfold drill (page 29).
• Set openers for FIELD (page 23).
FigureSpacer
Figure 24 - Unfold
Opener Unlock
15549