KayakDD-1 Digital Production Switcher
6.1.4
Installation Tasks
After completing the Pre-Installation procedures, the recommended installation tasks
given in this section are:
1. Unpack the equipment,
2. Install the KayakDD-1 Video Processor frame,
3. Install the KayakDD-1 control panel,
4. Connect all cables between KayakDD devices,
5. Connect cables to video inputs and outputs, and
6. Connect the power cables.
Power up and configuration, including setting IP addresses, is covered in detail in the
next sections of this manual.
34
Planning and Installation Manual
Содержание KayakDD-1
Страница 8: ...KayakDD 1 Digital Production Switcher Planning and Installation Manual 7 ...
Страница 9: ...KayakDD 1 Digital Production Switcher 8 Planning and Installation Manual ...
Страница 11: ...KayakDD 1 Digital Production Switcher 10 Planning and Installation Manual ...
Страница 15: ...KayakDD 1 Digital Production Switcher 14 Planning and Installation Manual ...
Страница 33: ...KayakDD 1 Digital Production Switcher 32 Planning and Installation Manual ...
Страница 89: ...KayakDD 1 Digital Production Switcher 88 Planning and Installation Manual ...
Страница 90: ...KayakDD 1 Digital Production Switcher Planning and Installation Manual 89 ...