21
wiRing diagRam FOR mOtOR cOnnectiOns
step 4 - powerinG operator up
programming press Buttons
Battery Back up
solar panel
0-110v-240v transformer (not used with solar and is in
a seperate weather proof box with low voltage kit)
24
vac
110
v
or 240
v
s
witch
240/1
10
ac
in
240/1
10
vac
f
lashing
light
dc
f
lashing
light
Buzzer
m
otor
24v+
gnd
15v+
(reg)
2 digital display
power switch control and accessory terminals
led
p
ower
led
r
emote
c
ontrol
input
led close
led open
for the sd version with out a battery simply plug it into a power point and turn
on the power switch to power it up. for versions with a battery back up connect
the battery first then plug the power in or connect the solar panel.
a battery back up can be added to an sd operator that doesn’t have one at any
time. the sd with a low voltage option must have a battery back up before it
will work properly.
solar power gate operators can be connected to mains power after installation
if you wanted.