![Grant's Automation SD series Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/grants-automation/sd-series/sd-series_installation-manual_2256853021.webp)
18
to fit the rack, start with the gate nearly closed and place the first length of rack
on the operators gear wheel, in line with the mark you made earlier and the
bottom rail. drill 10mm (or 3/8”) tek screws into two of the mounting lugs for the
rack, making sure they are both in the centre of each slot. do not fully tighten
at this stage, as the height of the rack needs to be adjusted.
move the gate by hand until each of the tek screws is close to the gear wheel
and adjust the height of the rack until it has about 1mm clearance above the
gear wheel. tighten the tek screws fully once the height is correct.
tek screw in
centre of slot
1mm