Section 4 - Attachments
4-3
80804002
Trenching Buckets
Installation Procedure
• Refer to
"Adapter Attachment Installation"
beginning on page 4-4.
Pavement Removal Bucket
Installation Procedure
• Refer to
"Adapter Attachment Installation"
beginning on page 4-4.
Size
Cu. Yd.
m3
15" (381mm)
1/5
.15
21" (533mm)
1/4
.19
Size
Cu. Yd.
m3
18" (.50m)
N/A
N/A
24" (.60m)
N/A
N/A
28" (.70m)
N/A
N/A
40" (1.02m)
N/A
N/A
OAC0720
OAC0730
Содержание XL3100IV
Страница 6: ...Read This First d 80804002 NOTES...
Страница 24: ...Section 1 General Safety Practices 1 14 80804002 NOTES...
Страница 33: ...Section 2 Pre Operation and Controls 2 9 80804002 NOTES...
Страница 53: ...Section 2 Pre Operation and Controls 2 29 80804002 NOTES...
Страница 61: ...Section 2 Pre Operation and Controls 2 37 80804002 NOTES...
Страница 79: ...Section 3 Operation 3 9 80804002 NOTES...
Страница 108: ...Section 3 Operation 3 38 80804002 This Page Intentionally Left Blank...
Страница 152: ...Section 5 Lubrication Maintenance 5 38 80804002 NOTES...
Страница 164: ...Section 7 Specifications 7 10 80804002 This Page Intentionally Left Blank...