
10. Remove the air motor top cover.
11. Disconnect electrical cable from air motor.
12. Remove air line from air motor and air lines to the
follower blow-off valve.
13. Tightly strap the air motor to the tie bar with a
cable through the air motor lift ring and around
the tie bar. See
14. Loosen u-bolts (X) from platen lift rods.
15. Remove nuts (F) from pump/air motor stand-off
rods at the pump end.
16. Remove nuts (Z) and bolts holding cable tract to
air motor support plate.
17. Slide end of cable track outboard of the mounting
plate.
18. Remove nuts (N) from follower lift rods.
19. Fully loosen pump rod coupler to the air motor
rod (G).
20. Slowly raise elevator to achieve enough
separation of the pump (air motor) tie rods to
remove the pump.
21. Remove the pump.
22. Reverse this procedure to reinstall the new or
rebuilt air motor.
334130D
47
Содержание Therm-O-Flow 200
Страница 48: ...Repair Figure 28 48 334130D...
Страница 56: ...Repair Figure 34 Inside of Electrical Control Enclosure 56 334130D...
Страница 59: ...Electrical Schematics 400V 400V 400V 3 3 3 Phase 50 Phase 50 Phase 50 Hz Hz Hz 334130D 59...
Страница 60: ...Electrical Schematics 400 600VV 400 600VV 400 600VV 3 3 3 Phase 60 Phase 60 Phase 60 Hz Hz Hz 60 334130D...
Страница 61: ...Electrical Schematics AWB AWB AWB and and and MZLP 1 MZLP 1 MZLP 1 334130D 61...
Страница 63: ...Electrical Schematics MZLP MZLP MZLP Zones Zones Zones 334130D 63...
Страница 67: ...Parts Electrical Electrical Electrical Module Module Module 334130D 67...
Страница 68: ...Parts 68 334130D...
Страница 94: ...Accessories and Kits 94 334130D...