
Prime
Prime
Prime Pump
Pump
Pump
1.
Ensure that the system has completed the heat
soak cycle. The display status bar should read
Active
Active
Active.
2.
Adjust the air motor air regulator (CK) to 0 psi.
3.
Ensure air motor solenoid valve (CN) is on. The
indicator light on the solenoid connector will only
be on if “Enable Pump Autostart” is selected on
the System 1 Setup screen.
4.
Adjust the air motor slider valve (CM) to the open
position.
5.
Adjust the air motor air regulator (CK) to
approximately 20 psi (138 kPa, 1.38 bar).
6.
Place a waste container under the bleed stem
(Z). Using an adjustable wrench, open the bleed
stem counterclockwise 1/3 -1/2 turn.
334130D
31
Содержание Therm-O-Flow 200
Страница 48: ...Repair Figure 28 48 334130D...
Страница 56: ...Repair Figure 34 Inside of Electrical Control Enclosure 56 334130D...
Страница 59: ...Electrical Schematics 400V 400V 400V 3 3 3 Phase 50 Phase 50 Phase 50 Hz Hz Hz 334130D 59...
Страница 60: ...Electrical Schematics 400 600VV 400 600VV 400 600VV 3 3 3 Phase 60 Phase 60 Phase 60 Hz Hz Hz 60 334130D...
Страница 61: ...Electrical Schematics AWB AWB AWB and and and MZLP 1 MZLP 1 MZLP 1 334130D 61...
Страница 63: ...Electrical Schematics MZLP MZLP MZLP Zones Zones Zones 334130D 63...
Страница 67: ...Parts Electrical Electrical Electrical Module Module Module 334130D 67...
Страница 68: ...Parts 68 334130D...
Страница 94: ...Accessories and Kits 94 334130D...