
Installation
14
313431K
Ceiling Mounting Directly to an I-Beam - HP
Models Only
1.
Using the template (B), provided, drill holes in the
I-Beam (C) (F
. 8).
2.
Bolt reel to I-Beam.
3.
If you are installing permanent supply lines, drill 1.5
in. (38 mm) diameter holes through the ceiling
toward the inlet side of the reels.
4.
Continue installation following steps 5 - 10 of Over-
head Installations instructions, beginning on page
11.
Ceiling Mounting to I-Beam without Drilling
Holes - All models
(Order Mounting Bracket Kit: 204741 for open or
enclosed reels.)
NOTE: For mounting 1-3 reels, two kits are required. For
mounting 4-6 reels, three kits are required.
1.
Secure mounting brackets (D) to the channel. Use
two mounting brackets for each 1- to 3 capacity
mounting channel (103). (Use 3 brackets for 4-6 reel
channels.)
2.
Position the adjustable clamps (206) of the mount-
ing brackets over the I-Beam (A), and tighten them
securely (F
. 9).
3.
HP Model Reels only (F
reel onto the base plate (104) and install the
hold-down plate (101), washer (103) and capscrew
(102). Tighten the screw firmly.
NOTE: For enclosed reels, use the Enclosure Kit Base
Plate (Part No. 302, page 21).
4.
If you are installing permanent supply lines, drill 1.5
in. (38 mm) diameter holes through the ceiling
toward the inlet side of the reels.
F
IG
. 8
A
B
C
ti13186
FN
Description
Qty
201
WASHER, lock, 1/2”
2
202
SCREW, 1/2” - 13 x 1”
2
203
SCREW, 1/2” - 13 x 1-3/4”
2
204
NUT 1/2” - 13
2
205
NUT, spring clamp (not
shown)
2
206
CLAMP, beam
2
207
CHANNEL, unistrut
1
Содержание SD HP Series
Страница 29: ...Maintenance 313431K 29...
Страница 50: ...Mounting Channel Dimensions 50 313431K Side Dimension All Models 2 5 inch 63 5 mm...
Страница 51: ...Notes 313431K 51 Notes...