Installation
6
334222B
Installation
Grounding
DataTrak:
ground through AC adapter.
Customer Provided PLC Machine Monitoring Kit:
ground through customer supplied grounding source.
Light Tower:
ground through DataTrak kit cable.
Customer Signal Module:
ground through DataTrak kit
cable.
Attach the Monitoring Controls
DataTrak
1. Attach the Display Module (DM) bracket to the left
air cylinder.
2. Attach the DM to the bracket.
3. Plug the D-Sub harness into the bottom of the DM.
Customer Provided PLC
1. Attach the monitoring control box to the left air cylin-
der.
NOTICE
To avoid injury or machine damage, perform
Shut-
down Procedure
found within the General Industry
Supply Systems, Operation-Parts manual prior to
installing any of the following kits.
NOTICE
To avoid machine damage, route all cables to avoid
pinching during normal machine operation.
The equipment must be grounded to reduce the risk of
static sparking and electric shock. Electric or static
sparking can cause fumes to ignite or explode.
Improper grounding can cause electric shock.
Grounding provides an escape wire for the electric
current.
Display
Module