Starting a New Job
332119E
13
Starting a New Job
1. Perform
Pressure Relief Procedure
, page 10.
2. Pour material into paint hopper (S).
3. Prime the Pump:
a. To fill field marker with fluid, press spray button
(A) and allow field marker to run until material
flows through prime hose.
b. Stop field marker by pressing spray button.
4. Put prime/spray valve (D) in DOWN position.
5. Reverse spray tip (X) to UNCLOG position, spray
for two seconds and then stop.
NOTE:
Failure to perform this operation could result
in poor spray pattern.
6. Put prime/spray valve (D) UP to release pressure.
Then rotate spray tip (X) back to spray position.
7. Put prime/spray valve (D) down and you are ready
to spray.
NOTICE
If material fails to flow through prime hose, the inlet ball
check valve may be stuck due to improper cleaning and
storage. Reach into hopper. Press button to break the inlet
ball check free.
ti20183a
ti24707a
ti20214a
S
ti20212a
ti21316a
A
ti20184a
D
ti20192a
ti20213a
X
ti20191a
ti20183a
D
X
ti20184a
D