Operation
22
311075ZAB
Operation
Pressure Relief Procedure
Follow the Pressure Relief Procedure whenever
you see this symbol.
1. Engage the piston safety lock or trigger safety lock.
2. Set the function knob to Park
.
3. Turn the Spray valves to Recirc. Fluid will be
dumped to the supply tanks. The pumps will move
to the bottom of their stroke. Ensure that the gauges
drop to 0.
Startup of Heated Units
1. Perform
2. Set function knob to Slow Recirc
or Fast
Recirc .
, page 23,
before continuing to step 3.
3. Turn on Heater Power.
4. Temporarily set the heater control knobs to the
maximum setting.
5. Circulate through the heaters until the temperature
readouts display desired temperature. Refer to
T
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury from
pressurized fluid, such as skin injection, splashing
fluid and moving parts, follow the Pressure Relief
Procedure when you stop spraying and before
cleaning, checking, or servicing the equipment.
Fusion
MD2
Some models heat the fluid, which can cause
equipment surfaces to become very hot. To avoid
severe burns:
•
Do not operate Reactor E-10 without all covers
and shrouds in place.
•
Do not touch hot fluid or equipment.
•
Allow equipment to cool completely before
touching it.
•
Wear gloves if fluid temperature exceeds 110 °F
(43 °C).
Fast Recirc
Slow Recirc