![Gow-Mac 580 series Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/gow-mac/580-series/580-series_operating-manual_2248317035.webp)
Series 580 TCD Gas Chromatograph
September 2017, Rev. 5
35
I. Daily Setup Check List
It is good practice to check the following items at the beginning of each day or shift, and when
starting up the instrument after a weekend shutdown.
1. Electrical
_____ Additional instrumentation is connected properly.
2. Pneumatic
_____ Gas cylinder pressure is suffi cient.
_____ Cylinder pressure regulator set properly.
_____ Gas fl ow rates are adjusted properly.
_____ Appropriate columns are installed.
_____ Carrier gas fl ow pressure at 40 psig.
_____ Leak check made.
3. Front Panel
_____ All temperature settings are set BELOW the recommended circuitry maximum limits
(See Charts 5-1 thru 5-5)
_____ Recorder/Integrator/software zeroed.
Содержание 580 series
Страница 2: ...GOW MAC Instrument Co 2 ...
Страница 6: ...GOW MAC Instrument Co 6 ...
Страница 8: ...GOW MAC Instrument Co 8 ...
Страница 10: ...GOW MAC Instrument Co 10 ...
Страница 24: ...GOW MAC Instrument Co 24 ...
Страница 36: ...GOW MAC Instrument Co 36 ...
Страница 42: ...GOW MAC Instrument Co 42 ...
Страница 54: ...GOW MAC Instrument Co 54 ...
Страница 62: ...GOW MAC Instrument Co 62 ...
Страница 66: ...GOW MAC Instrument Co 66 ...
Страница 68: ...GOW MAC Instrument Co 68 ...