Gossen Metrawatt GmbH
19
SECU
TEST ST
B
ASE
(
10
) /
P
RO
and SECU
LIFE ST
BASE
(25)
9
Test Instrument Settings
After initial startup (see
section 7), basic system
parameters must first be
configured. Then you’ll
need to decide which stan-
dard designations will be
used for the integrated,
preconfigured test sequences and, if neces-
sary, change the assignment of test
sequences to rotary switch positions.
Attention!
!
The standard designation cannot be
changed retroactively! Stored mea-
surements retain the standard desig-
nation and it’s used in the test report.
For this reason, select the standard
designation carefully during initial
startup.
As soon as the standard designation
has been changed, the new designa-
tion is used in all future tests.
9.1
System Parameters
Basic system parameters must first be set:
Setup 1/3 > System 1/2 > Culture >
Language
Setup 1/3 > System 1/2 > Culture >
Keyboard Layout
Setup 1/3 > System 1/2 >
Date/Time
(for report generation)
Setup 1/3 > System 2/2 >
Brightness
(display brightness as %)
9.2
Test Standards /
Configuration of Integrated Test
Sequences
Test sequences in accordance with the stan-
dards (also called measurement or test
sequences) are preconfigured and inte-
grated into the test instrument. They consist
of a series of individual tests with subse-
quent documentation, as stipulated in the
respective standard. They can thus be used
to repeatedly and efficiently perform stan-
dards-compliant tests. Additional informa-
tion is available in section 14, “Test
Sequences (automatic test sequences)”.
In order to use the integrated test
sequences, they have to be prepared during
initial startup:
The integrated test sequences are identical
in terms of content, but they have different
national designations depending on the
country (DIN, VDE, ÖNORM, SNR etc.). Fur-
thermore, there are variants for each inte-
grated test sequence, e.g. for testing
PRCDs.
This is why a standard designation must first
be selected in the test instrument for the
integrated test sequences.
Attention!
!
Selection of the standard designation
is mandatory and must be com-
pleted during initial startup.
Standards which are not needed can be
deactivated in order to increase clarity.
The integrated test sequences are run in
orange rotary switch positions A1 through
A9. Integrated test sequences are preas-
signed to each rotary switch position at the
factory, but these assignments can be
changed. You can assign a different inte-
grated test sequence to a rotary switch posi-
tion if required, or leave the preselected,
integrated test sequences as they are.
9.2.1
Selecting the Standard Designation
and Deactivating Standards
During initial startup, the desired national
standard designation must be selected for
each integrated test sequence.
The integrated test sequences are identified
with this designation:
•
For display at the test instrument (routine
daily work)
•
In the test results saved to the test
instrument (and when these results are
exported, e.g. to IZYTRONIQ test soft-
ware) (data management)
•
In reports (verification requirement)
SETUP