3/8" WASHER
BOLT CAP
3/8" WASHER
LAG SCREW
3/8 X 3-1/2"
SWING BEAM PLATE
3/8" LOCK NUT
BOLT
9"
CARRIAGE
TORQUE WASHER
STEP 27: MOUNT SWING BEAM ON FORT
AN EXTRA PERSON IS NEEDED FOR THIS STEP.
1: HAVE ONE PERSON WALK THE SWING BEAM OUT TO THE END OF THE FORT FROM INSIDE THE FORT WHILE THE
OTHER PERSON CARRIES IT BY THE LEGS.
2: LINE UP THE PILOT HOLE AT THE END OF THE SWING BEAM WITH THE MIDDLE HOLE ON THE SWING BEAM PLATE.
3: FASTEN THE SWING BEAM TO THE SWING BEAM PLATE AND THE SWING BEAM MOUNT USING A 9" CARRIAGE
BOLT WITH A TORQUE WASHER AND A 3/8" LOCK NUT WITH A 3/8" WASHER ON THE BOTTOM. PLACE GREEN BOLT
CAPS OVER EXPOSED THREADS AFTER SECURING.
4: FASTEN THE SWING BEAM TO THE SWING BEAM PLATE FROM UNDERNEATH WITH A 3/8 X 3-1/2" LAG SCREW AND
3/8" WASHER.
5: IF NECESSARY USE VISE GRIPS TO HOLD CARRIAGE BOLT IN PLACE WHEN INSTALLING.
63
Содержание Savannah II 1500FT
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 90: ...PART II CLATTER BRIDGE WITH TARP 82 ...