1: PLACE A LEVEL ON TOP OF THE SWING BEAM AND ADJUST THE BEAM LEGS IN OR OUT AS NEEDED TO MAKE THE
SWING BEAM LEVEL.
STEP 28: LEVEL SWING BEAM
IMPORTANT NOTE: THE LEGS ARE
DESIGNED TO ACCOMODATE SWING
BEAMS ON UNEVEN GROUND
(DOWN SLOPE). THE LEGS ARE
LONGER THAN REQUIRED. IF YOUR
GROUND IS RELATIVELY LEVEL, YOU
MAY EITHER:
A) DIG IN BOTH LEGS WHERE THEY
MEET THE GROUND
OR
B) BEND THE LEGS OUT SLIGHTLY TO
MATCH YOUR GRADE.
IN
OUT
64
Содержание Savannah II 1500FT
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 90: ...PART II CLATTER BRIDGE WITH TARP 82 ...