2: ONCE THE FRAME IS LEVEL, SQUARE, AND SET INTO POSITION; GO BACK AND INSERT THE 5/16 X 3-1/2" LAG
BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG SCREWS.
A
B
STEP 7: LAG SCREWS
C
SCREWS AND 5/16" WASHERS IN THE REMAINING HOLES OF THE 2 X 6 PARTS SHOWN BELOW. NOTE: THERE WILL NOT
1: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO LEVEL
AND SQUARE THE STRUCTURE. TO SQUARE AND LEVEL THE DECK OF THE TOWER TO THE DECK OF THE FORT PLACE A
DECK BOARD ACROSS THE 2 X 4'S. THEN PLACE A 2 X 4 X 66" BRIDGE RAIL ON TOP OF THE DECK BOARD AND ON
TOP OF THE FORT DECK. PLACE A LEVEL ON TOP OF THE 66" BRIDGE RAIL, THEN MAKE THE DECKS LEVEL TO ONE
ANOTHER.
D
59"
5/16 X 3-1/2"
LAG SCREW
5/16" WASHER
FRONT OF TOWER
PUT 5/16" X 3-1/2" LAG
SCREWS IN THE BOTTOM
HOLES OF THESE BOARDS
ONCE YOU LEVEL AND
SQUARE THE TOWER.
NOTE HOLES IN THIS
BOARD. USE THEM TO
ORIENT YOURSELF
BEFORE PUTTING IN
LAG SCREWS.
DISTANCE BETWEEN
CORNER POST ON
TOWER AND CORNER
POST ON PLAY SET IS 59".
(SKIP AHEAD TO STEP 14
IF YOU NEED MORE
DETAILS ON THE 59"
DIMENSION.)
89
Содержание Savannah II 1500FT
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 90: ...PART II CLATTER BRIDGE WITH TARP 82 ...