16" TOP OF TOP RAIL
TO BOTTOM OF
LOWER RAIL
5/16" WASHER
LAG SCREW
TOP BRIDGE RAIL
5/16" X 3-1/2"
LOWER BRIDGE RAIL
59" CORNER
POST TO CORNER
POST
STEP 14: MOUNTING BRIDGE RAILS TO LEFT SIDE
1: PLACE THE BRIDGE RAILS AGAINST THE CORNER POST AND 4 X 4 CENTER POST ON THE
PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X
3-1/2" LAG SCREWS AND 5/16" WASHERS.
3: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS USING THE 16" DIMENSION
AT THE LEFT SIDE AS SHOWN ON STEP 13 AND BELOW. ATTACH EACH LOWER BRIDGE RAIL
WITH 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
96
Содержание Savannah II 1500FT
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 90: ...PART II CLATTER BRIDGE WITH TARP 82 ...