
L
1: LINE UP THE HOLES OF THE IRON DUCTILE SWING HANGERS WITH THE HOLES IN THE SWING BEAM. IF YOUR BEAM
IS BOWED SLIGHTLY PLACE THE BOW SIDE UP; THE SWING HANGERS WILL BE ON THE BOTTOM.
2: FASTEN EACH SWING HANGER TO THE SWING BEAM USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS, AND
3/8" WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
STEP 23: IRON DUCTILE SWING HANGERS
7" CARRIAGE BOLT
3/8" LOCK NUT
TORQUE WASHER
3/8" WASHER
BOLT CAPS
IRON DUCTILE
SWING HANGER
76
Содержание Malibu Pioneer Peak 1500DWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 125: ...PART 2 CLATTER BRIDGE ASSEMBLY 117...
Страница 160: ...APPENDIX 152...