
STEP 23: DRILLING CORNER POST HOLES
1: CHECK THE DIMENSION OF THE ROOF SUPPORT ASSEMBLIES AS SHOWN BELOW BEFORE
DRILLING HOLES.
2: MEASURE AS SHOWN BELOW AND MAKE MARKS ON THE CORNER POSTS ON THE
INSIDE.
3: DRILL A 9/64" HOLE BY 2-1/2" DEEP AT EACH MARK.
4: REPEAT SUBSTEPS 2-3 ON THE INSIDE OF THE OTHER POSTS
AS POINTED OUT BELOW.
REPEAT THE
MEASURE/MARK/DRILL
PROCESS ON THE
INSIDE OF THESE
CORNER POSTS.
USE 1-7/8"
FOR GREEN POSTS.
STAINED
16
1"
POSTS
"
1"
1 13
33 38 "
33 7
16 "
140
Содержание Malibu Pioneer Peak 1500DWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 125: ...PART 2 CLATTER BRIDGE ASSEMBLY 117...
Страница 160: ...APPENDIX 152...