
•Page
globalcontract.com
28
GLOBAL
Contract
• August 2018
INSTALLATION GUIDELINES
Stationary Divider Install
BWASLLD - Stationary laminate divider
BWASGD - Stationary glass divider
BWASFD - Stationary framed divider
Dividers share the same features and steps to connect to the table’s structure:
STEP 3: Position the stationary divider above the shared trough between the tables.
STEP 4: Slide the brackets down at either side. NOTE: the brackets must rest against
the vertical wall of the trough. Make sure that the brackets are not against the vertical
wall of the beam leg.
STEP 5: Set both bracket notches over the loosened through screws.
STEP 6: Replace the trough covers.
The top brackets are secured to the worksurfaces and as rollers ride up and down
inside the divider’s extruded side channels, the brackets stabilize the dividers.
STEP 7: Ensure that the worksurfaces are parallel to each other, with a precise 4.500”
gap between the rear edges.
If not, then adjust the worksurface’s position on the table’s structure.
Do not proceed unless both worksurfaces are installed correctly, parallel with 4.500”
gap between the rear’s worksurfaces’ edges!
STEP 8: Press the bracket’s notch against the rear work surface edge.
STEP 9: Establish side-to-side bracket’s location by inserting the roller bushing A
into the vertical track B.Leave ” gap C between the bracket and the extrusion.
STEP 10: Secure all four top brackets to work surfaces
Note:TEST THE FINAL ASSEMBLY!Ride either work surface up and down its entire
height-adjustment range.
If the table frame structure is correctly assembled and if both work surfaces are
parallel to each other (precise 4.500” gap between the rear edges) rollers should
ride smoothly within the tacks.If not make table structure, work surface position
or top bracket adjustments as necessary.
6
5
4
3