•Page
globalcontract.com
12
GLOBAL
Contract
• August 2018
INSTALLATION GUIDELINES
BWATTC Table to Table Connector
Continue with assembling all the remaining table structures, including power
troughs and place them in their desired location. Proceedfrom the first table
assembly at the beginning of a run and install the table to table connector to
organize cables and establish an accurate distance.
STEP 1: Position the table to table connector under the column cross beam
and align its holes with threaded holes in the bottom of the column cross
beam. Secure with two supplied machine screws.
STEP 2: Finalize adjacent table assembly, align the adjacent column cross beam holes with the
holes on the opposite side of the table to table connector.
STEP 3: Secure the table to table connector with two supplied machine screws.
STEP 4: Install the power distribution components and data cables before snapping them into
the bottom trough channel.
1/4-20x0.5” pan head
machine screw x4
1
2
3
4