Page
•
globalcontract.com
21
• August 2018
GLOBAL
Contract
INSTALLATION GUIDELINES
Cable Snake
The cable snake consists of a number of flexible, interlocking components
and a steel bottom bracket. Its purpose is to organize cables between the
access door grommet and the FreeFit trough.
Each table requires its own cable snake, installed either on the left or right
side. Its location is governed by position of the worksurface grommet. If cor-
rectly installed, the cable snake will curve towards the centre of the table.
STEP 1: Identify on which side should the cable snake be installed. Secure
the bottom end of the cable snake by driving two countersunk screws into
the steel bracket. Slide in the cable snake’s end segment.
STEP 2: Slide the steel bracket at the end of the cable snake into the notches
in the power trough (notches are near the duplex receptacles).
STEP 3: Align the mounting bracket holes with those of the work-surface
pilot holes. Please note that if the orientation of the cable snake top mounting
bracket shows the receiving “open”, the end of the bracket faces the centre of
the table. As the cable snake always curves toward the centre of the table, it
will snap into the bracket from the centre of the worksurface as well.
STEP 4: Secure the top end of the cable snake by driving two countersunk
screws into the underside of the worksurface.
STEP 5: Slide in the cable snake’s first segment.
5
4
3
2
1