INSTALLATION
MANUAL
EN
MI_020
Rev.1
29/04/2020
Page 9 of 24
2.6
Warranty and liabilities
GIMA disclaims all liability as regards unreliable Product operation
in the following cases:
-
Installation, authorized modifications and repairs have not been
performed by TECHNICAL SERVICE PERSONNEL.
-
The Product has not been used for its intended purpose and in
conformity with the operating instructions (see operation
manual).
-
The premises have not been approved for healthcare activities.
-
The premises are not built in conformity with the law and
applicable regulations.
-
The electrical system in the premises is not in compliance with
appropriate requirements.
2.7
Structural changes or variations
CAUTION
No arbitrary structural changes or variations to the Product are
admitted. Any modifications must have the prior written
authorization of GIMA. In case of the Product having been tampered
with, the warranty shall be invalidated and the manufacturer
disclaims all liability for any injuries or damage caused to the
OPERATOR, the RESPONSIBLE ORGANIZATION and the TECHNICAL
SERVICE PERSONNEL.
3
Instructions on how to prepare the
premises
mechanically
and
electrically
3.1
Preparing the premises mechanically
(ceiling version)
Carry out safe masonry works.
The masonry works for preparing the ceiling to install the Product
must be sturdy and safe and performed in a workmanlike manner
according to applicable building regulations.
By way of example only, the professional persons charged with
completing the masonry works are: Construction Engineer,
Draughtsman, Building firm, duly registered in a professional
register.
Collapse of the building
structure.
In case of wrong perforation of the Product supporting wall (e.g., the
breakage of a reinforced-concrete ceiling iron) always inform the
building manager as this could affect the stability of the building.
Make sure that ceiling is
adequate.
The ceiling must be able to withstand a weight of at least 300 kg/m
2
and have a thickness of at least 250 mm.
The Product installation premises must conform to local building
standards.
After making sure the premises used for medical purposes are in
conformity with the above requirements, proceed to mechanically
anchor the ceiling plate, assessing the type of building and making
all consequent adaptations.
Содержание GIMAled81
Страница 37: ...MANUALE D USO E MANUTENZIONE IT MU_027 Rev 1 29 04 2020 Pag 13 di 33 Modello a piantana...
Страница 57: ...MANUALE D USO E MANUTENZIONE IT MU_027 Rev 1 29 04 2020 Pag 33 di 33 Note...
Страница 94: ...OPERATION AND MAINTENANCE MANUAL EN MU_027 Rev 1 29 04 2020 Page 13 of 33 Mobile model...
Страница 114: ...OPERATION AND MAINTENANCE MANUAL EN MU_027 Rev 1 29 04 2020 Page 33 of 33 Notes...