22
Model: GVH-C & GVH-F
Installation
2.07
Final Installation - continued
1. Confirm that both the hood and cooking appliances are
properly wired and that installation of the fire suppression
system is complete.
2. Ensure that the hood is located in the final operating
location.
3. Level the unit side to side, front to back and corner to
corner. Adjust the leveling legs by rotating the lower foot
portion of the leg ... turning to the right shortens it,
turning to left lengthens it.
4 After unit is level, use appropriated technique and
hardware to anchor it to the floor. Floor plates on the
front legs are for this purpose.
Floor-Stand Installation (GVH-F)
Содержание GVH-C
Страница 2: ......
Страница 4: ......
Страница 12: ...2 Model GVH C GVH F Introduction 1 04 Specifications 1 04 1 Overall Dimensions GVH C Counter Top Version ...
Страница 13: ...3 Model GVH C GVH F Introduction 1 04 1 Overall Dimensions GVH F Floor Stand Version ...
Страница 17: ...7 Model GVH C GVH F Installation 2 03 Clearance to Combustibles 2 03 1 GVH Counter Top Hood GVH C ...
Страница 18: ...8 Model GVH C GVH F Installation 2 03 2 GVH Floor Stand Hood GVH F ...
Страница 34: ...Model GVH C GVH F Overview 24 1 5 2 4 3 8 9 3 01 Control Panel 6 7 ...
Страница 36: ...26 Model GVH C GVH F Overview Optional Not Seen 3 02 Hood Front Filter Chamber 1 5 2 6 7 4 3 8 ...
Страница 49: ...39 Model GVH C GVH F Operation Filter Maintenance ...
Страница 56: ...46 Model GVH C GVH F Troubleshooting ...
Страница 60: ...50 Model GVH C GVH F Parts List Hidden Optional 7 03 Hood Front Filter Compartment 9 2 1 8 3 5 6 4 7 11 10 ...
Страница 64: ...54 Parts List Model GVH C GVH F 7 05 Under Hood Components 2 1 4 3 ...
Страница 66: ...56 Model GVH C GVH F Parts List ...
Страница 67: ......