63
Fryer Operation
GBF-Series Fryers
9. Set Power Switch
to the
OFF
position.
13
5.04
Removal of Liquid Shortening (continued)
16
14
•
During the next step be sure the wear oven
mitts. Some parts of the Discharge Hose
assembly and coupling will become very hot
.
12. Remove the Discharge Hose from the Discharge
Hose Coupling by pushing the slip-ring
“in”
while
pulling the hose fitting out. Drain any oil remaining
in the hose into the oil disposal container.
13. Allow the Filter Pan to sufficiently cool. Remove
the Filter Pan assembly, disassemble and
thoroughly clean.
14. To perform a Boil-Out on the unit, see
Section
6.01, Boil-Out Procedure
.
To shut down unit, see
Section 5.05, Normal
Shut-Down
.
10.
On the unit being drained
, position Drain Valve
Handle
to the
CLOSE
position.
11. Place the Pump Diverter Valve handle
to the
“OIL RETURN”
position.
16
14
13
WARNING
Содержание GBF-35 Banked
Страница 4: ......
Страница 7: ...v Table Of Contents 8 10 Fry Vat Assembly 92 8 11 Filter Pan Assembly 94 Notes GBF Series Fryers ...
Страница 12: ...x ...
Страница 22: ...10 Installation GBF Series Fryers Notes ...
Страница 24: ...12 Overview GBF Series Fryers 3 01 Auto Basket Lifts Optional Baskets 4 2 1 3 1 Not fully seen ...
Страница 30: ...18 GBF Series Fryers Overview 3 03 Lower Cabinet Area Single Fryer Base Unit of Banked Systems 1 2 3 4 5 6 ...
Страница 32: ...20 Overview GBF Series Fryers 3 04 Lower Cabinet Area Add on Fryers for Banked Systems 1 2 ...
Страница 34: ...22 Overview GBF Series Fryers 3 05 Filter Pan Unit Single Fryer Base Unit of Banked Systems 1 2 3 5 6 4 8 7 ...
Страница 42: ...30 Overview GBF Series Fryers Notes ...
Страница 86: ...74 NOTES ...
Страница 106: ...94 Parts List GBF Series Fryers 8 11 Filter Pan 3 1 5 4 2 8 9 7 10 6 A ...
Страница 108: ...96 Parts List GBF Series Fryers Notes ...
Страница 109: ...FOODSERVICE EQUIPMENT ...