FlexPay NC3L Wide Installation and maintenance
15
5.
INSTALLATION INSTRUC TIONS
The installation shall be performed in accordance with security regulations for service stations, issued by
responsible authorities.
All the operations must be done after disconnecting all supply lines and following all suitable procedures to
operate in explosion hazardous areas. Check before installation that the intended location meets this
requirement.
Warning
Installation operations are allowed only when safety conditions
are put in place.
Disconnect all supply lines before starting the installation.
Terminals do not have a safety switch, but such shall be installed in the electrical power centre.
The terminal shall not be modified without writ
ten permission from Gilbarco, otherwise the manufacturer’s
product liability will be voided.
Interference is prevented by installing power and communications cables in separate cable ducts.
Remove scrap cables from cable manholes.
The shield of the communications cable is grounded in the master system and shall have an unbroken shield
connection through connection boxes to the terminal.
Warning
Please read “Power-on procedure for temperatures lower than
0°C
” chapter before switching on the terminal.