I
UK
UK
MAINTENANCE
Periodically check the gate paying particular attention to
• Check the hinge pivots;
• Check good functioning of the safety devices;
• Unlock the operator and check that there are no points of friction along the entire travel of the gate;
• Check that there is no dirt or deposits on the transmission levers.
Periodically check proper adjustment of the electronic anti-crushing safety device and the efficiency of the unlocking
device for manual operation (see the relevant paragraph).
The safety devices installed on the system must be checked every six months. Gi.Bi.Di. Srl reserves the right to
change the technical data without prior notice in relation to product development.
:
For any unresolved malfunction, cut the power to the system and call in a qualified technician (installer
In the period when the gate is out of service, activate the manual unlocking device to allow manual opening and
closing.
).
MALFUNCTIONING
GROUND
24
Содержание GROUND 610
Страница 3: ...GROUND 3 2a 3 4 2b PULL 60 mm 180 mm 436 mm 353 mm 414 mm 343 mm 72 mm 72 mm 180 mm 180 mm 72 mm 60 mm...
Страница 4: ...GROUND 4 9 7 8 6 5 72 mm 35 mm 200 mm 400 mm 500 mm 6 5 3 4 2 1...
Страница 5: ...GROUND 11 13 14 10 12 min 10 mm C 250 mm min 40 mm C PULL 5...
Страница 8: ...GROUND 8 20 21...
Страница 9: ...6 5 3 4 7 3 5 1 2 4 7 4 3 6 5 1 2 GROUND 22 24 25 23 9...
Страница 43: ...GROUND 43 NL...
Страница 50: ...GROUND 50 NOTE NOTES...
Страница 51: ...GROUND 51 NOTE NOTES...