Seite 26 von 68
Rev.: 1113803-1
7.3
Fitting thermal insulation and thermometer
U
Check for Leaks
Before fitting the insulation, check installation and unit for any leaks,
including the base of the vessel.
Fit the thermal insulation:
1.
Close the sealing rail on one
of the two sides of the
valves.
2.
Bend the insulation sections
around the vessel and seal
on the opposite side.
3.
Fit PS cover in position
4.
Fit snap-in clamps at top and
bottom
5.
Place PS cover over
maintenance flange
Содержание JRG Coral force 11000
Страница 2: ...Seite 2 von 68 Rev 1113803 1...
Страница 15: ...Seite 15 von 68 Rev 1113803 1...
Страница 23: ...Seite 23 von 68 Rev 1113803 1 7 2 Filling and bleeding...
Страница 24: ...Seite 24 von 68 Rev 1113803 1...
Страница 25: ...Seite 25 von 68 Rev 1113803 1...
Страница 29: ...Seite 29 von 68 Rev 1113803 1...
Страница 30: ...Seite 30 von 68 Rev 1113803 1 8 1 1 Initialisation and Settings Automatic Hygiene Program...
Страница 31: ...Seite 31 von 68 Rev 1113803 1...
Страница 32: ...Seite 32 von 68 Rev 1113803 1...
Страница 33: ...Seite 33 von 68 Rev 1113803 1...
Страница 64: ...Seite 64 von 68 Rev 1113803 1 Close filler plug tightly...