
MBZ300
8
Installation
2.6 Object-specifically pre-configured control panels
In addition to the standard control panels, the object-specifically pre-configured control panels (Mat. 137453) are
available from GEZE. A wide range of configurations can be selected for these control panels, e.g.
à
Power range and housing size as per the basic control unit (N10, N24 …)
à
Number and sequence of the modules
à
Drive modules DM, DME
à
Sensor modules SM
à
Additional relay modules ERM for operating and error messages
à
Weather module WM
à
CAN module for connecting several control panels
à
Additional series terminals for DME or larger cable cross-sections
à
Size of the battery
à
Pre-setting of various parameters, e.g.
à
Status contacts
à
Configuration of venting groups
à
Configuration of fire sections
3
Installation
Installation sequence (overview)
X
Before starting work check the completeness and correctness of the delivery against the delivery note (control
panel size, batteries, modules, etc.). Later complaints will not be accepted.
à
The MBZ300 emergency power control unit must be installed in a location protected from heat.
X
Have someone hold the control cabinet and the MBZ300 emergency power control unit during screwing.
X
Check the configuration of the MBZ300 emergency power control unit equipment and adapt/supplement if necessary.
X
Fasten the housing securely and keep easily accessible for maintenance.
X
Mark fastening holes.
X
Select suitable fastening agents for the base.
X
Drill holes and insert dowels.
X
Screw the control cabinet in place.
X
Screw the MBZ300 emergency power control unit in place.
X
Mount drives and control devices (observe permissible connection values and specifications of the respective
installation instructions).
X
Cut off the graduated nipples in accordance with the cable diameter.
X
Route the cables through the graduated nipples into the control panel.
X
Connect external components.
X
Connect mains power supply.
X
Install and connect batteries.
X
Put the system into operation.
3.1 Control cabinet ventilation
There are batteries installed in the control cabinet which need ventilating for safety reasons. There are ventilation
holes on the front of the control cabinet for this, and a ventilation plug on the top of the control cabinet.
Damage caused by overheating
X
Do not seal the bore holes (1) on the front of the control cabinet.
X
Do not remove or seal the ventilation plug (2) on the top of the control cabinet.
Bore holes
Ventilation plug
Содержание MBZ300
Страница 47: ...MBZ300 47...